Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37307
Well Classification: OW Status: SI - 8/1/2025
Well Name/No:Peppler Farms #1F-4H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2025
FacilityID:432829LocationID:432823
County:WELD #123Location:SENE 4 3N68W 6
Field:WATTENBERG - #90750Elevation:5057 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1635FNL  303 FELLat/Long: 40.258040 / -104.999760Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.258034 / -104.999808Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/8/2014
End Date: 5/10/2014
Reported: 7/6/2014
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 8/1/2025             Measured TD: 11959 ft.    Vertical TD: 7400 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 8/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/9/2015
Proposed Top PZ Location:Sec:4 Twp: 3N 68W Footage: 1959 FNL  750 FEL
Bottom Hole Location:Sec:4 Twp: 3N 68W Footage: 1889 FNL  460 FWL
Proposed Depth/Form:11935 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7837 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 444, Top: 500 ft., Bottom: 7837 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11936 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 168, Top: 7537 ft., Bottom: 11936 ft.

Wellbore Completed
Completion Date:1/9/2014
Spud Date:12/28/2013Spud Date Is:ACTUAL
Measured TD:11959 ft.Measured PB depth:11941 ft.
True Vertical TD:7400 ft.True Vertical PB depth:7400 ft.
Top PZ Location:Sec:4 Twp: 3N 68WFootage: 1857 FNL  488 FEL
Bottom Hole Location:Sec:4 Twp: 3N 68WFootage: 1902 FNL  511 FWL
Log Types:CBL/MWD/(IND run in API: 123-37306)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 432, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 873 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 357, Top: 0 ft., Bottom: 883 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7612 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 720 ft., Bottom: 7625 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11944 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 355, Top: 6612 ft., Bottom: 11959 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4363 ft.
SHANNON4637 ft.
TEEPEE BUTTES6082 ft.
SHARON SPRINGS7095 ft.
NIOBRARA7542 ft.
CODELL7625 ft.

Formation CODL                     Formation Classification:  OW                     Status:  SI - 8/1/2025                  Interval Top: 7641 ft.    Interval Bottom: 11894 ft.

 Completed Information for Formation CODELL
1st Production Date:6/17/2014Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/9/2014Treatment End Date:6/5/2014
Treatment Summary:Stages 1 - 15 treated with a total of: 76,175 bbls of slickwater and 1,309,466 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):87035Max pressure during treatment (psi):8230
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):390Total flowback volume recovered (bbls):390
Fresh water used in treatment (bbls):75785Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1309466Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7496 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/24/2014Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 432
BBLS_OIL 233
BTU_GAS 1298
CALC_BBLS_H2O 432
CALC_BBLS_OIL 233
CALC_GOR 910
CALC_MCF_GAS 212
CASING_PRESS 2373
GRAVITY_OIL 50
MCF_GAS 212
TUBING_PRESS 1720
Perforation Data:
Interval Top:7641 ft.# Of Holes:405
Interval Bottom:11894 ft.Hole Size:0.375 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)72
Total Gas Produced (MCF)350
GOR4861
GOR DeterminationBOE
Average BOE per Day0.359
Average MCFE per Day2.088

 Federal Financial Assurance  i 

 Tribal Well  i No