|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/25/2025 Measured TD: 11754 ft. Vertical TD: 7334 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/25/2025 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 5/9/2015 | Proposed Top PZ Location: | Sec:34 Twp: 7N 66W | Footage: 734 FNL 1481 FEL | Bottom Hole Location: | Sec:34 Twp: 7N 66W | Footage: 500 FSL 1105 FEL | Proposed Depth/Form: | 11787 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 830, Top: 0 ft., Bottom: 875 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7899 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: 500 ft., Bottom: 7899 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6585 ft., Depth: 11787 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 1/4/2014 | Spud Date: | 12/24/2013 | Spud Date Is: | ACTUAL | Measured TD: | 11754 ft. | Measured PB depth: | 11746 ft. | True Vertical TD: | 7334 ft. | True Vertical PB depth: | 7334 ft. | Top PZ Location: | Sec:34 Twp: 7N 66W | Footage: 803 FNL 1482 FEL | Bottom Hole Location: | Sec:34 Twp: 7N 66W | Footage: 501 FSL 1125 FEL | Log Types: | CBL, MWD | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 930 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 830, Top: 0 ft., Bottom: 930 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7716 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 616, Top: 200 ft., Bottom: 7716 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7544 ft., Depth: 11750 ft., Weight: 13.5 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3763 ft. | | | | SUSSEX | 4349 ft. | | | | SHANNON | 4982 ft. | | | | SHARON SPRINGS | 6945 ft. | | | | NIOBRARA | 7097 ft. | | | | FORT HAYS | 7675 ft. | | | | CODELL | 10049 ft. | | | | CARLILE | 10223 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 7/25/2017 Interval Top: 10223 ft. Interval Bottom: 10380 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/14/2017 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 10,223' - 10,380' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 10223 ft. | # Of Holes: | | Interval Bottom: | 10380 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 7/25/2017 Interval Top: 10049 ft. Interval Bottom: 11754 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/14/2017 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 10,049' - 10,223' & 10,380' - 11,754' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 10049 ft. | # Of Holes: | | Interval Bottom: | 11754 ft. | Hole Size: | |
|
Formation CLCDFH Formation Classification: OW Status: AB - 4/25/2025 Interval Top: 7833 ft. Interval Bottom: 11663 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 3/4/2014 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 2/10/2014 | Treatment End Date: | 2/11/2014 | Treatment Summary: | 25 Stage Sliding Sleeve, Swell Packer set at 7750'
Total Fluid: 70,036 bbls
Slickwater Fluid: 19,238 bbls
Gel Fluid: 50,798 bbls
Total Proppant: 3,855,760 lbs
Silica Proppant: 3,855,760 lbs
Method for determining flowback volumes: Measuring flowback tank volume | Total fluid used in treatment (bbls): | 70036 | Max pressure during treatment (psi): | 7775 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 25 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 1.01 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 8942 | Fresh water used in treatment (bbls): | 70036 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3855760 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 75 | BBLS_OIL | 143 | BTU_GAS | 1303 | CALC_BBLS_H2O | 75 | CALC_BBLS_OIL | 143 | CALC_GOR | 2916 | CALC_MCF_GAS | 417 | CASING_PRESS | 1687 | GRAVITY_OIL | 44 | MCF_GAS | 417 | TUBING_PRESS | 667 |
| Perforation Data: | Interval Top: | 7833 ft. | # Of Holes: | 100 | Interval Bottom: | 11663 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: OW Status: CM - 7/25/2017 Interval Top: 7716 ft. Interval Bottom: 10049 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/14/2017 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 7,716' - 10,049' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7716 ft. | # Of Holes: | | Interval Bottom: | 10049 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 04/25/2025 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 09/13/2028 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 53 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.025 |
Average MCFE per Day | 0.147 |
Federal Financial Assurance | i | |
|
|