Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37271
Well Classification: OW Status: SI - 9/1/2024
Well Name/No:O Investment Properties #6Y-401
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2024
FacilityID:432759LocationID:432763
Municipality/County:EATON / WELD #123Location:SESE 6 6N65W 6
Field:WATTENBERG - #90750Elevation:4777 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:500FSL  236 FELLat/Long: 40.511090 / -104.697700Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.511080 / -104.697720Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/14/2013
End Date: 12/14/2013
Reported: 12/16/2013
Days to report: 2
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 9/1/2024             Measured TD: 11587 ft.    Vertical TD: 7180 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/29/2015
Proposed Top PZ Location:Sec:6 Twp: 6N 65W Footage: 766 FSL  154 FEL
Bottom Hole Location:Sec:6 Twp: 6N 65W Footage: 500 FNL  148 FEL
Proposed Depth/Form:11587 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7706 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7706 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6402 ft., Depth: 11587 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/8/2013
Spud Date:10/28/2013Spud Date Is:ACTUAL
Measured TD:11587 ft.Measured PB depth:11578 ft.
True Vertical TD:7180 ft.True Vertical PB depth:7180 ft.
Top PZ Location:Sec:6 Twp: 6N 65WFootage: 766 FSL  154 FEL
Bottom Hole Location:Sec:6 Twp: 6N 65WFootage: 500 FNL  148 FEL
Log Types:CBL, MWD (DIL in 123-11545)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 927 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 927 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7500 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 623, Top: 0 ft., Bottom: 7500 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7352 ft., Depth: 11582 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3794 ft.
SUSSEX4509 ft.
SHANNON4994 ft.
SHARON SPRINGS6725 ft.
NIOBRARA6890 ft.
FORT HAYS7553 ft.
CODELL7874 ft.
CARLILE8704 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/28/2019                 Interval Top: 8704 ft.    Interval Bottom: 11332 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,704'-8,934' 11,067'-11,332'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8704 ft.# Of Holes:
Interval Bottom:11332 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/28/2019                 Interval Top: 7874 ft.    Interval Bottom: 11587 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,874'-8,704' 9,989'-11,067' 11,332'-11,587'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7874 ft.# Of Holes:
Interval Bottom:11587 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  SI - 9/1/2024                  Interval Top: 7553 ft.    Interval Bottom: 11587 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/23/2013Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/14/2013Treatment End Date:12/14/2013
Treatment Summary:16 Stage Sliding Sleeve, Swell Packer set @ 7,553' Total Fluid: 58,631 bbls Gel Fluid: 46,924 bbls Slickwater Fluid: 11,707 bbls Total Proppant: 3,674,040 lbs Silica Proppant: 3,674,040 Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):58631Max pressure during treatment (psi):3954
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):354
Fresh water used in treatment (bbls):58631Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3674040Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7183 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/4/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 154
BBLS_OIL 193
BTU_GAS 1252
CALC_BBLS_H2O 154
CALC_BBLS_OIL 193
CALC_GOR 1368
CALC_MCF_GAS 264
CASING_PRESS 1714
GRAVITY_OIL 46
MCF_GAS 264
TUBING_PRESS 753
Perforation Data:
Interval Top:7553 ft.# Of Holes:
Interval Bottom:11587 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2019                 Interval Top: 7553 ft.    Interval Bottom: 9989 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,553'-7,874' 8,934'-9,989'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7553 ft.# Of Holes:
Interval Bottom:9989 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/30/2025
Defined Inactive (SI )YDefined Inactive
08/31/2024
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No