Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37231
Well Classification: OW Status: PR - 2/9/2014
Well Name/No:Devore #1A-34H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/9/2014
FacilityID:432682LocationID:432679
County:WELD #123Location:NENE 34 3N66W 6
Field:WATTENBERG - #90750Elevation:4962 ft.
Planned Location:251FNL  1382 FELLat/Long: 40.188220 / -104.758710Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.188220 / -104.758710Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/3/2014
End Date: 1/9/2014
Reported: 4/11/2014
Days to report: 92
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/9/2014             Measured TD: 11977 ft.    Vertical TD: 7414 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/9/2014
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/26/2015
Proposed Top PZ Location:Sec:34 Twp: 3N 66W Footage: 766 FNL  2637 FEL
Bottom Hole Location:Sec:34 Twp: 3N 66W Footage: 460 FSL  2550 FEL
Proposed Depth/Form:12016 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7950 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 451, Top: 500 ft., Bottom: 7950 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12016 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 167, Top: 7650 ft., Bottom: 12016 ft.

Wellbore Completed
Completion Date:10/27/2013
Spud Date:10/16/2013Spud Date Is:ACTUAL
Measured TD:11977 ft.Measured PB depth:11958 ft.
True Vertical TD:7414 ft.True Vertical PB depth:11959 ft.
Top PZ Location:Sec:34 Twp: 3N 66WFootage: 766 FNL  2637 FEL
Bottom Hole Location:Sec:34 Twp: 3N 66WFootage: 460 FSL  2550 FEL
Log Types:CBL, MWD, (Dual Induction 123-24073)
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 119 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: 119 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1035 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 398, Top: 0 ft., Bottom: 1035 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7881 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 1300 ft., Bottom: 7881 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11961 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 6881 ft., Bottom: 11961 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7213 ft.
NIOBRARA7250 ft.
FORT HAYS7710 ft.
CODELL7830 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 2/9/2014                  Interval Top: 7902 ft.    Interval Bottom: 11916 ft.

 Completed Information for Formation CODELL
1st Production Date:2/2/2014Choke Size:14.000 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/3/2014Treatment End Date:1/9/2014
Treatment Summary:Stage 1 - Stage 27 treated with a total of: 90,329 bbls of Borate Crosslink Gel (Chem Rock), 2,670 bbls of Pump Down No Chemicals, 6,052,745 lbs of 30/50 Proppant
Total fluid used in treatment (bbls):92999Max pressure during treatment (psi):8188
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:27
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2750
Fresh water used in treatment (bbls):92999Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6052745Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7590 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/9/2014Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 58
BBLS_OIL 263
BTU_GAS 1298
CALC_BBLS_H2O 58
CALC_BBLS_OIL 263
CALC_GOR 3023
CALC_MCF_GAS 795
CASING_PRESS 2631
GRAVITY_OIL 50
MCF_GAS 795
TUBING_PRESS 1653
Perforation Data:
Interval Top:7902 ft.# Of Holes:807
Interval Bottom:11916 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)2972
Total Gas Produced (MCF)47186
GOR15876
GOR DeterminationMCFE
Average BOE per Day31.679
Average MCFE per Day183.744

 Federal Financial Assurance  i 

 Tribal Well  i No