Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37063
Well Classification: OW Status: PR - 8/1/2019
Well Name/No:North Platte #U-Y-28HNB
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2019
FacilityID:432321LocationID:332135
County:WELD #123Location:NENE 28 5N63W 6
Field:WATTENBERG - #90750Elevation:4546 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:388FNL  539 FELLat/Long: 40.376640 / -104.433050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.376640 / -104.433050Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/10/2013
End Date: 5/10/2013
Reported: 5/15/2013
Days to report: 5
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2019             Measured TD: 10789 ft.    Vertical TD: 6318 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/28/2015
Proposed Top PZ Location:Sec:28 Twp: 5N 63W Footage: 631 FNL  130 FEL
Bottom Hole Location:Sec:28 Twp: 5N 63W Footage: 570 FSL  130 FEL
Proposed Depth/Form:10779 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36.00 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6723 ft., Weight: 26.00 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 2500 ft., Bottom: 6723 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6623 ft., Depth: 10779 ft., Weight: 11.60 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/25/2013
Spud Date:4/16/2013Spud Date Is:ACTUAL
Measured TD:10789 ft.Measured PB depth:10789 ft.
True Vertical TD:6318 ft.True Vertical PB depth:6318 ft.
Top PZ Location:Sec:28 Twp: 5N 63WFootage: 742 FNL  134 FEL
Bottom Hole Location:Sec:28 Twp: 5N 63WFootage: 571 FSL  137 FEL
Log Types:CBL, MWD/LWD, Mud, (DIL/Density/Neutron on 123-21882).
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 465 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 465 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6718 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 755, Top: 1008 ft., Bottom: 6718 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6561 ft., Depth: 10781 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3403 ft.
SHARON SPRINGS6146 ft.
NIOBRARA6368 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2019                  Interval Top: 6843 ft.    Interval Bottom: 10789 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/25/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/10/2013Treatment End Date:5/11/2013
Treatment Summary:18-stage completion using sliding sleeves and casing packers; 55360 total bbls fluid pumped: 54722 bbls fresh water (slurry) and 638 bbls 15% HCl acid; 4232800 total lbs proppant pumped: 145500 lbs 40/70 sand, 3797460 lbs 30/50 sand, and 289840 lbs 20/40 sand.
Total fluid used in treatment (bbls):55360Max pressure during treatment (psi):7067
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):638Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10506
Fresh water used in treatment (bbls):54722Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4232800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6519 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 67
BTU_GAS 1282
CALC_BBLS_H2O 16
CALC_BBLS_OIL 67
CALC_GOR 5104
CALC_MCF_GAS 342
CASING_PRESS 523
GRAVITY_OIL 44
MCF_GAS 342
TUBING_PRESS 220
Perforation Data:
Interval Top:6843 ft.# Of Holes:
Interval Bottom:10789 ft.Hole Size:1.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4162
Total Gas Produced (MCF)9465
GOR2274
GOR DeterminationBOE
Average BOE per Day15.849
Average MCFE per Day91.944

 Federal Financial Assurance  i 

 Tribal Well  i No