|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/17/2013 Measured TD: 9846 ft. Vertical TD: 6157 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/17/2013 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/14/2015 | Prop Depth/Form: | 10590 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-265 , Unit Acreage: 640, Drill Unit: All | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 534, Top: 0 ft., Bottom: 1400 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6336 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 645, Top: 1400 ft., Bottom: 6336 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 5617 ft., Depth: 10590 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 4/21/2013 | Spud Date: | 4/17/2013 | Spud Date Is: | ACTUAL | Measured TD: | 9846 ft. | Measured PB depth: | 6560 ft. | True Vertical TD: | 6157 ft. | True Vertical PB depth: | 6159 ft. | Top PZ Location: | Sec:25 Twp: 9N 60W | Footage: 1358 FNL 677 FEL | Depth | Bottom Hole Location: | Sec:25 Twp: 9N 60W | Footage: 1358 FNL 677 FEL | Depth | Log Types: | MWD with Gamma Ray. CBL. | Casing: | String Type: CONDUCTOR, Hole Size: 18 in., Size: 16 in., Top: 0 ft., Depth: 77 ft., Weight: 16 , Citings Type: ACTUAL | Cement: | Sacks: 8, Top: 0 ft., Bottom: 77 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1373 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 657, Top: 0 ft., Bottom: 1373 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6386 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 545, Top: 350 ft., Bottom: 6386 ft., Determination Method: CBL | Casing: | String Type: OPEN HOLE, Hole Size: 6.25 in., Size: , Top: 6386 ft., Depth: 9846 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 509 ft. | 3471 ft. | N | | PARKMAN | 3471 ft. | 3821 ft. | N | | SUSSEX | 4046 ft. | 4352 ft. | N | | SHARON SPRINGS | 5980 ft. | 6105 ft. | N | | NIOBRARA | 6105 ft. | | N | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: SI - 7/1/2024 Measured TD: 10572 ft. Vertical TD: 6152 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW SI - 7/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 5/1/2015 | Prop Depth/Form: | 10569 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-265 , Unit Acreage: 640, Drill Unit: ALL | Casing: | String Type: CONDUCTOR, Hole Size: 16 in., Size: 15.25 in., Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 60 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1373 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 534, Top: 70 ft., Bottom: 1373 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6386 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 645, Top: 1373 ft., Bottom: 6386 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 5617 ft., Depth: 10569 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 5/4/2013 | Spud Date: | 4/17/2013 | Spud Date Is: | ACTUAL | Measured TD: | 10572 ft. | Measured PB depth: | 10220 ft. | True Vertical TD: | 6152 ft. | True Vertical PB depth: | 6153 ft. | Top PZ Location: | Sec:25 Twp: 9N 60W | Footage: 696 FSL 673 FEL | Depth | Bottom Hole Location: | Sec:25 Twp: 9N 60W | Footage: 650 FNL 690 FEL | Depth | Log Types: | MWD LOG, CBL No open hole logs were run. | Casing: | String Type: CONDUCTOR, Hole Size: 18 in., Size: 16 in., Top: 0 ft., Depth: 77 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 8, Top: 0 ft., Bottom: 77 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1373 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 657, Top: 0 ft., Bottom: 1373 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6386 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 545, Top: 350 ft., Bottom: 6386 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5513 ft., Depth: 10262 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6105 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: SI - 7/1/2024 Interval Top: 6532 ft. Interval Bottom: 9965 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/15/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/9/2013 | Treatment End Date: | 5/10/2013 | Treatment Summary: | FRACTURE STIMULATED THROUGH A PORT AND PACKER SYSTEM 13 STAGES WITH 2,862,281 LBS OF 20/40 SAND AND 44449 BBLS OF FRESH WATER. WE DID NOT USE ACID OR GAS. TOP OF PRODUCTION INTERVAL ISOLATED VIA SWELL PACKER 6532' MD. | Total fluid used in treatment (bbls): | 44449 | Max pressure during treatment (psi): | 5830 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.90 | Type Of gas: | | Number Of staged intervals: | 13 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.79 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 5726 | Fresh water used in treatment (bbls): | 44449 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2862281 | Green completions techniques utilized: | No | Reason green techniques Not utilized: PIPELINE |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5950 ft. | Tubing Packer Depth: | 6532 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/15/2013 | Test Method: | | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 671 | BBLS_OIL | 101 | CALC_BBLS_H2O | 671 | CALC_BBLS_OIL | 101 | CASING_PRESS | 180 | GRAVITY_OIL | 32 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 6532 ft. | # Of Holes: | 13 | Interval Bottom: | 9965 ft. | Hole Size: | 4.5 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1597 |
Total Gas Produced (MCF) | 5220 |
GOR | 3268 |
GOR Determination | BOE |
Average BOE per Day | 6.834 |
Average MCFE per Day | 39.639 |
Federal Financial Assurance | i | |
|
|