Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36982
Well Classification: OW Status: SI - 1/1/2025
Well Name/No:Billings #3B-18H L368
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:432160LocationID:432004
County:WELD #123Location:NWSW 18 3N68W 6
Field:WATTENBERG - #90750Elevation:5155 ft.
Planned Location:1630FSL  952 FWLLat/Long: 40.222704 / -105.051741Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.222703 / -105.051740Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/10/2015
End Date: 1/17/2015
Reported: 2/12/2016
Originally Reported: 2/26/2015
Days to report: 391
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2025             Measured TD: 14105 ft.    Vertical TD: 7329 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/13/2015
Proposed Top PZ Location:Sec:18 Twp: 3N 68W Footage: 2228 FSL  879 FWL
Bottom Hole Location:Sec:17 Twp: 3N 68W Footage: 2126 FSL  1929 FWL
Proposed Depth/Form:14387 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7683 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 435, Top: 500 ft., Bottom: 7683 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14387 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 267, Top: 7383 ft., Bottom: 14387 ft.

Wellbore Completed
Completion Date:11/1/2014
Spud Date:10/11/2014Spud Date Is:ACTUAL
Measured TD:14105 ft.Measured PB depth:14034 ft.
True Vertical TD:7329 ft.True Vertical PB depth:7329 ft.
Top PZ Location:Sec:18 Twp: 3N 68WFootage: 2228 FSL  879 FWL
Bottom Hole Location:Sec:17 Twp: 3N 68WFootage: 2126 FSL  1929 FWL
Log Types:CBL, MWD, MUD
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 156 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 155 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 867 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 373, Top: 0 ft., Bottom: 885 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7609 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 667, Top: 600 ft., Bottom: 7630 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14085 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 4267 ft., Bottom: 14105 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6975 ft.
NIOBRARA7047 ft.
FORT HAYS7829 ft.
CODELL7992 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/11/2017                 Interval Top: 8031 ft.    Interval Bottom: 14034 ft.

 Completed Information for Formation CODELL
1st Production Date:3/27/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2015Treatment End Date:1/18/2015
Treatment Summary:Stages 1-16 and 18-40 are in the Codell formation. The perforation intervals for the Codell are: 8,031 - 11,488 and 11,731 - 14,034.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8031 ft.# Of Holes:1128
Interval Bottom:14034 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/11/2017                 Interval Top: 7831 ft.    Interval Bottom: 11683 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/27/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/14/2015Treatment End Date:1/18/2015
Treatment Summary:Stages 17, and 41-42 are in the Ft Hays formation. The performation intervals for the Ft Hays are: 7,831 - 7,983 and 11,532 - 11,683. This formation was treated on 1/14/15 and 1/18/15.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7831 ft.# Of Holes:1128
Interval Bottom:11683 ft.Hole Size:

Formation NBFHC                   Formation Classification:  OW                   Status:  SI - 12/1/2024                 Interval Top: 7627 ft.    Interval Bottom: 14034 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:3/27/2015Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2015Treatment End Date:1/18/2015
Treatment Summary:Stages 1 - 43 treated with 87,048 bbls of total fluids, 86,585 bbls of fresh water, 415 bbls of slickwater, 48 bbls of 15%HCL acid, and 3,949,005 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):87048Max pressure during treatment (psi):8679
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4400
Fresh water used in treatment (bbls):87000Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3949005Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7174 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/3/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 633
BBLS_OIL 142
BTU_GAS 1298
CALC_BBLS_H2O 633
CALC_BBLS_OIL 142
CALC_GOR 1134
CALC_MCF_GAS 161
CASING_PRESS 2081
GRAVITY_OIL 50
MCF_GAS 161
TUBING_PRESS 1320
Perforation Data:
Interval Top:7627 ft.# Of Holes:1128
Interval Bottom:14034 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/11/2017                 Interval Top: 7627 ft.    Interval Bottom: 7783 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/27/2015Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/18/2015Treatment End Date:1/18/2015
Treatment Summary:Stage 43 is in the Niobrara formation. The perforation interval is 7,627 - 7,783.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7627 ft.# Of Holes:1128
Interval Bottom:7783 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
06/2024 - 05/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2024 - May 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.003

 Federal Financial Assurance  i 

 Tribal Well  i No