Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36959
Well Classification: OW Status: PR - 10/13/2013
Well Name/No:Waste Management #2Q-401
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/13/2013
FacilityID:432124LocationID:432121
County:WELD #123Location:SESW 2 2N64W 6
Field:WATTENBERG - #90750Elevation:4932 ft.
Planned Location:230FSL  2140 FWLLat/Long: 40.160820 / -104.520620Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.160830 / -104.520640Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/18/2013
End Date: 9/19/2013
Reported: 9/30/2013
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/13/2013             Measured TD: 11502 ft.    Vertical TD: 7028 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/13/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/12/2015
Proposed Top PZ Location:Sec:2 Twp: 2N 64W Footage: 635 FSL  2517 FWL
Bottom Hole Location:Sec:2 Twp: 2N 64W Footage: 485 FNL  2493 FWL
Proposed Depth/Form:11428 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7593 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7593 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6279 ft., Depth: 11428 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/15/2013
Spud Date:8/5/2013Spud Date Is:ACTUAL
Measured TD:11502 ft.Measured PB depth:11494 ft.
True Vertical TD:7028 ft.True Vertical PB depth:7028 ft.
Top PZ Location:Sec:2 Twp: 2N 64WFootage: 635 FSL  2517 FWL
Bottom Hole Location:Sec:2 Twp: 2N 64WFootage: 485 N  2493 W
Log Types:CBL, MUD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 931 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 931 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7305 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 643, Top: 920 ft., Bottom: 7305 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7165 ft., Depth: 11498 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3793 ft.
SUSSEX4296 ft.
SHANNON5216 ft.
SHARON SPRINGS6638 ft.
NIOBRARA6768 ft.
FORT HAYS7370 ft.
CODELL8536 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/10/2020                 Interval Top: 8536 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:4/10/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,536'-11,502'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8536 ft.# Of Holes:
Interval Bottom:Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  SI - 12/1/2024                 Interval Top: 7370 ft.    Interval Bottom: 11502 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:10/3/2013Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/18/2013Treatment End Date:9/19/2013
Treatment Summary:16 Stage Sliding Sleeve, Swell Packer set at 7,370' Total Fluid: 60,235 bbls Gel Fluid: 47,357 bbls Slickwater Fluid: 12,878 bbls Total Proppant: 3,591,980 lbs Silica Proppant: 3,591,980 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):60235Max pressure during treatment (psi):4108
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6621
Fresh water used in treatment (bbls):60235Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3591980Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7063 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2013Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 311
BBLS_OIL 306
BTU_GAS 1347
CALC_BBLS_H2O 311
CALC_BBLS_OIL 306
CALC_GOR 1291
CALC_MCF_GAS 395
CASING_PRESS 1362
GRAVITY_OIL 44
MCF_GAS 395
TUBING_PRESS 980
Perforation Data:
Interval Top:7370 ft.# Of Holes:
Interval Bottom:11502 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/10/2020                 Interval Top: 7370 ft.    Interval Bottom: 8536 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:4/10/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,370'-8,536'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7370 ft.# Of Holes:
Interval Bottom:8536 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1141
Total Gas Produced (MCF)10328
GOR9051
GOR DeterminationBOE
Average BOE per Day7.982
Average MCFE per Day46.301

 Federal Financial Assurance  i 

 Tribal Well  i No