Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36954
Well Classification: OW Status: PR - 12/1/2023
Well Name/No:Waste Management #2i-401
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2023
FacilityID:432117LocationID:432119
County:WELD #123Location:SWSW 2 2N64W 6
Field:WATTENBERG - #90750Elevation:4939 ft.
Planned Location:230FSL  620 FWLLat/Long: 40.160850 / -104.526060Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.160860 / -104.526060Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/2/2013
End Date: 9/5/2013
Reported: 9/9/2013
Days to report: 4
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2023             Measured TD: 11425 ft.    Vertical TD: 7053 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/12/2015
Proposed Top PZ Location:Sec:2 Twp: 2N 64W Footage: 823 FSL  117 FWL
Bottom Hole Location:Sec:2 Twp: 2N 64W Footage: 500 FNL  156 FWL
Proposed Depth/Form:11432 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7606 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7606 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 6298 ft., Depth: 11432 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/2/2013
Spud Date:5/22/2013Spud Date Is:ACTUAL
Measured TD:11425 ft.Measured PB depth:11417 ft.
True Vertical TD:7053 ft.True Vertical PB depth:7053 ft.
Top PZ Location:Sec:2 Twp: 2N 64WFootage: 823 FSL  117 FWL
Bottom Hole Location:Sec:2 Twp: 2N 64WFootage: 500 N  156 W
Log Types:CBL, MUD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 951 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 0 ft., Bottom: 951 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7441 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 668, Top: 10 ft., Bottom: 7441 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7296 ft., Depth: 11421 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3918 ft.
SUSSEX4265 ft.
SHANNON5252 ft.
SHARON SPRINGS6678 ft.
NIOBRARA6797 ft.
FORT HAYS7502 ft.
CODELL9086 ft.
CARLILE9271 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/28/2019                 Interval Top: 9271 ft.    Interval Bottom: 11299 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 9,271'-9,325' 10,555'-11,299'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9271 ft.# Of Holes:
Interval Bottom:11299 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/31/2019                 Interval Top: 9086 ft.    Interval Bottom: 11425 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 9,086'-9,271' 9,325'-9,609' 10,483'-10,555' 11,299'-11,425'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2013Treatment End Date:9/3/2013
Treatment Summary:16 Stage Codell Completion 3288400 lb Ottowa 20/40 192600 lb SBXL 20/40 Total Fluid 51888 max treatment pressure 8048
Total fluid used in treatment (bbls):51888Max pressure during treatment (psi):8048
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14408
Fresh water used in treatment (bbls):51888Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3481000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 36
BBLS_OIL 269
BTU_GAS 1547
CALC_BBLS_H2O 36
CALC_BBLS_OIL 269
CALC_GOR 1460
CALC_MCF_GAS 393
CASING_PRESS 1762
GRAVITY_OIL 45
MCF_GAS 393
TUBING_PRESS 794
Perforation Data:
Interval Top:9086 ft.# Of Holes:
Interval Bottom:11425 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 12/1/2023                 Interval Top: 7502 ft.    Interval Bottom: 11425 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/19/2013Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/2/2013Treatment End Date:9/5/2013
Treatment Summary:16 Stage Sliding Sleeve, Swell Packer set at 7,502' Total Fluid: 62,318 bbls Gel Fluid: 48,049 bbls Slickwater Fluid: 14,269 bbls Total Proppant: 3,416,597 lbs Silica Proppant: 3,416,597 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):62318Max pressure during treatment (psi):4310
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7439
Fresh water used in treatment (bbls):62318Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3416597Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7058 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/4/2013Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 36
BBLS_OIL 269
BTU_GAS 1547
CALC_BBLS_H2O 36
CALC_BBLS_OIL 269
CALC_GOR 1461
CALC_MCF_GAS 393
CASING_PRESS 1762
GRAVITY_OIL 45
MCF_GAS 393
TUBING_PRESS 794
Perforation Data:
Interval Top:7502 ft.# Of Holes:
Interval Bottom:11425 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2019                 Interval Top: 7502 ft.    Interval Bottom: 10483 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,502'-9,086' 9,609'-10,483'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7502 ft.# Of Holes:
Interval Bottom:10483 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2159
Total Gas Produced (MCF)8271
GOR3830
GOR DeterminationBOE
Average BOE per Day9.777
Average MCFE per Day56.678

 Federal Financial Assurance  i 

 Tribal Well  i No