Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36953
Well Classification: OW Status: SI - 8/1/2024
Well Name/No:Waste Management #2L-441
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2024
FacilityID:432116LocationID:432119
County:WELD #123Location:SWSW 2 2N64W 6
Field:WATTENBERG - #90750Elevation:4939 ft.
Planned Location:230FSL  680 FWLLat/Long: 40.160840 / -104.525850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.160860 / -104.525860Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/7/2013
End Date: 9/9/2013
Reported: 9/9/2013
Days to report: 0
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 8/1/2024             Measured TD: 11379 ft.    Vertical TD: 7039 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/12/2015
Proposed Top PZ Location:Sec:2 Twp: 2N 64W Footage: 844 FSL  833 FWL
Bottom Hole Location:Sec:2 Twp: 2N 64W Footage: 499 FNL  800 FWL
Proposed Depth/Form:11424 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7594 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7594 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6283 ft., Depth: 11424 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/25/2013
Spud Date:6/15/2013Spud Date Is:ACTUAL
Measured TD:11379 ft.Measured PB depth:11371 ft.
True Vertical TD:7039 ft.True Vertical PB depth:7039 ft.
Top PZ Location:Sec:2 Twp: 2N 64WFootage: 844 FSL  833 FWL
Bottom Hole Location:Sec:2 Twp: 2N 64WFootage: 499 N  800 W
Log Types:CBL, MUD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 934 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 934 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7379 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 559, Top: 0 ft., Bottom: 7379 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7246 ft., Depth: 11375 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3877 ft.
SUSSEX4174 ft.
SHANNON5223 ft.
SHARON SPRINGS6650 ft.
NIOBRARA6774 ft.
FORT HAYS7452 ft.
CODELL8061 ft.
CARLILE9243 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/28/2019                 Interval Top: 9243 ft.    Interval Bottom: 9469 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 9,243'-9,469'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9243 ft.# Of Holes:
Interval Bottom:9469 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/28/2019                 Interval Top: 8061 ft.    Interval Bottom: 11379 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,061'-9,243' 9,643'-10,262' 10,886'-11,379'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8061 ft.# Of Holes:
Interval Bottom:11379 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  SI - 8/1/2024                  Interval Top: 7452 ft.    Interval Bottom: 11379 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/23/2013Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/7/2013Treatment End Date:9/9/2013
Treatment Summary:16 Stage Sliding Sleeve, Swell Packer set at 7,452' Total Fluid: 63,591 bbls Gel Fluid: 47,334 bbls Slickwater Fluid: 16,257 bbls Total Proppant: 3,524,570 lbs Silica Proppant: 3,524,570 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):63591Max pressure during treatment (psi):4066
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7563
Fresh water used in treatment (bbls):63591Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3524570Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7158 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2013Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 89
BBLS_OIL 262
BTU_GAS 1262
CALC_BBLS_H2O 89
CALC_BBLS_OIL 262
CALC_GOR 1344
CALC_MCF_GAS 352
CASING_PRESS 1821
GRAVITY_OIL 47
MCF_GAS 352
TUBING_PRESS 681
Perforation Data:
Interval Top:7452 ft.# Of Holes:
Interval Bottom:11379 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2019                 Interval Top: 7452 ft.    Interval Bottom: 10886 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed depths: 7,452'-8,061' 9,469'-9,643' 10,262'-10,886'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7452 ft.# Of Holes:
Interval Bottom:10886 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1752
Total Gas Produced (MCF)12120
GOR6917
GOR DeterminationBOE
Average BOE per Day10.466
Average MCFE per Day60.710

 Federal Financial Assurance  i 

 Tribal Well  i No