Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36868
Well Classification: OW Status: SI - 8/1/2023
Well Name/No:Nelson #2-17-9-60
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2023
FacilityID:431927LocationID:431925
County:WELD #123Location:SESW 17 9N60W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4992 ft.
Planned Location:268FSL  1616 FWLLat/Long: 40.742940 / -104.121170Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.742940 / -104.121170Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/6/2013
End Date: 6/11/2013
Reported: 6/28/2013
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 8/1/2023             Measured TD: 10910 ft.    Vertical TD: 6446 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/21/2015
Prop Depth/Form:10819 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-238 , Unit Acreage: 640, Drill Unit: ALL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 534, Top: 0 ft., Bottom: 1400 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6621 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 746, Top: 1400 ft., Bottom: 6621 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 5881 ft., Depth: 10819 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/12/2013
Spud Date:3/19/2013Spud Date Is:ACTUAL
Measured TD:10910 ft.Measured PB depth:10796 ft.
True Vertical TD:6446 ft.True Vertical PB depth:6444 ft.
Top PZ Location:Sec:17 Twp: 9N 60WFootage: 757 FSL  706 FWLDepth
Bottom Hole Location:Sec:17 Twp: 9N 60WFootage: 512 FNL  665 FWLDepth
Log Types:MWD, CBL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 36.9 , Citings Type: ACTUAL
Cement:Sacks: 8, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1439 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 557, Top: 0 ft., Bottom: 1439 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6668 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 573, Top: 1290 ft., Bottom: 6668 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5681 ft., Depth: 10898 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 321, Top: 5850 ft., Bottom: 10898 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE6487 ft.NN
SHARON SPRINGS6370 ft.6487 ft.NN
NIOBRARA6487 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 8/1/2023                  Interval Top: 6939 ft.    Interval Bottom: 10770 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/29/2013Choke Size:26.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2013Treatment End Date:6/11/2013
Treatment Summary:FRACTURE STIMULATE IN 14 STAGES THROUGH A PORT AND PACKER SYSTEM WITH 3,253,601 LBS OF 20/40 SAND AND 84,580 BBLS FRESH WATER, AND 690 BBLS OF 15% HCL ACID.
Total fluid used in treatment (bbls):85270Max pressure during treatment (psi):6652
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.90
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):690Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):32140
Fresh water used in treatment (bbls):84580Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3253601Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6050 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2013Test Method:
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 617
BBLS_OIL 286
BTU_GAS 1195
CALC_BBLS_H2O 617
CALC_BBLS_OIL 286
CALC_GOR 248
CALC_MCF_GAS 71
CASING_PRESS 305
GRAVITY_OIL 33
MCF_GAS 71
TUBING_PRESS 3100
Perforation Data:
Interval Top:6939 ft.# Of Holes:166
Interval Bottom:10770 ft.Hole Size:0 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
07/31/2023
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No