|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2022 Measured TD: 7893 ft. Vertical TD: 7657 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/21/2015 | | Proposed Top PZ Location: | Sec:19 Twp: 3N 68W | Footage: 717 FNL 1912 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 68W | Footage: 713 FNL 1891 FWL | | Proposed Depth/Form: | 7841 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 450 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 0 ft., Bottom: 450 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7841 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 6776 ft., Bottom: 7841 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/19/2013 | | Spud Date: | 4/12/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 7893 ft. | Measured PB depth: | 7589 ft. | | True Vertical TD: | 7657 ft. | True Vertical PB depth: | 7353 ft. | | Top PZ Location: | Sec:19 Twp: 3N 68W | Footage: 717 FNL 1912 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 68W | Footage: 713 FNL 1891 FWL | | Log Types: | Cement Bond Log
High Resolution Induction, Compensated Density, Compensated Neutron
BHC Sonic, Gamma Ray, Caliper | | Log Types: | CBL, High Resolution Induction/Compensated Density/Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 643 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 643 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7893 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 460, Top: 2330 ft., Bottom: 7893 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 3914 ft. | | | | | NIOBRARA | 7028 ft. | | | | | CODELL | 7302 ft. | | | | | J SAND | 7759 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 1/1/2022 Interval Top: 7770 ft. Interval Bottom: 7792 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/1/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/22/2013 | Treatment End Date: | 8/22/2013 | | Treatment Summary: | FRAC WITH 4466 BBLS SLICKWATER, 4466 BBLS TOTAL FLUID, 155680 POUNDS OF SAND | | Total fluid used in treatment (bbls): | 4466 | Max pressure during treatment (psi): | 3778 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1120 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 155680 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7770 ft. | # Of Holes: | 66 | | Interval Bottom: | 7792 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/2/2015 Interval Top: 7303 ft. Interval Bottom: 7323 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/1/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/22/2013 | Treatment End Date: | 8/22/2013 | | Treatment Summary: | FRAC WITH 4413 BBLS SLICKWATER, 4413 BBLS TOTAL FLUID, 147410 POUNDS OF SAND. | | Total fluid used in treatment (bbls): | 4413 | Max pressure during treatment (psi): | 4221 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.83 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1120 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 147410 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7303 ft. | # Of Holes: | 60 | | Interval Bottom: | 7323 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/14/2013 Interval Top: 7037 ft. Interval Bottom: 7792 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 11/1/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7726 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/14/2013 | Test Method: | | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 74 | | BBLS_OIL | 135 | | BTU_GAS | 1287 | | CALC_BBLS_H2O | 74 | | CALC_BBLS_OIL | 135 | | CALC_GOR | 2903 | | CALC_MCF_GAS | 392 | | CASING_PRESS | 1787 | | GRAVITY_OIL | 45 | | MCF_GAS | 392 | | TUBING_PRESS | 1000 |
| | Perforation Data: | | Interval Top: | 7037 ft. | # Of Holes: | 224 | | Interval Bottom: | 7792 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 1/1/2022 Interval Top: 7037 ft. Interval Bottom: 7323 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/1/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7037 ft. | # Of Holes: | 164 | | Interval Bottom: | 7323 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/2/2015 Interval Top: 7037 ft. Interval Bottom: 7107 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/1/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/22/2013 | Treatment End Date: | 8/22/2013 | | Treatment Summary: | FRAC NBRR WITH 12 BBLS ACID, 4523 BBLS SLICKWATER, 4535 BBLS TOTAL FLUID, 150100 POUNDS OF SAND. | | Total fluid used in treatment (bbls): | 4535 | Max pressure during treatment (psi): | 3975 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1120 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 150100 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7037 ft. | # Of Holes: | 104 | | Interval Bottom: | 7107 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 12/31/2021 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|