Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36581
Well Classification: OW Status: PR - 2/1/2024
Well Name/No:Razor #25-2411H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2024
FacilityID:431382LocationID:431118
County:WELD #123Location:NWNW 25 10N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4763 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:264FNL  661 FWLLat/Long: 40.816264 / -103.820411Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.816256 / -103.820395Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/16/2013
End Date: 5/16/2013
Reported: 5/21/2013
Days to report: 5
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: DG - 3/31/2013             Measured TD: 9800 ft.    Vertical TD: 5649 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        DG - 3/31/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/16/2015
Proposed Top PZ Location:Sec:24 Twp: 10N 58W Footage: 660   652 
Bottom Hole Location:Sec:24 Twp: 10N 58W Footage: 660   660 
Proposed Depth/Form:10286 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-180 , Unit Acreage: 640, Drill Unit: All 24
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 739, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6299 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 438, Top: 0 ft., Bottom: 6299 ft.
Casing:String Type: 2ND, Hole Size: 6 in., Size: 4.5 in., Top: 4908 ft., Depth: 10286 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/8/2013
Spud Date:3/31/2013Spud Date Is:Actual
Measured TD:9800 ft.Measured PB depth:6777 ft.
True Vertical TD:5649 ft.True Vertical PB depth:5672 ft.
Bottom Hole Location:Sec:24 Twp: 10N 58WFootage: 1234 FNL  606 FWL
Log Types:The direct offset well to the Razor 25-2411H was cored and had open hole logs ran on it.
Casing:String Type: CONDUCTOR, Hole Size: 25 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 56 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: 80 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 766, Top: 0 ft., Bottom: 1650 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6155 ft., Weight: 29,32 , Citings Type: ACTUAL
Cement:Sacks: 429, Top: 250 ft., Bottom: 6155 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 6 in., Size: , Top: 6155 ft., Depth: 9800 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS5548 ft.5554 ft.NN
NIOBRARA5554 ft.NN
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: PR - 2/1/2024             Measured TD: 10082 ft.    Vertical TD: 5668 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PR - 2/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/22/2015
Proposed Top PZ Location:Sec:24 Twp: 10N 58W Footage: 660 FSL  661 FWL
Bottom Hole Location:Sec:24 Twp: 10N 58W Footage: 660 FNL  660 FWL
Proposed Depth/Form:10109 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-296 , Unit Acreage: 640, Drill Unit: All 24
Casing:String Type: CONDUCTOR, Hole Size: 25 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 56 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 739, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6299 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 438, Top: 0 ft., Bottom: 6200 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5908 ft., Depth: 10286 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 0, Top: , Bottom:

Wellbore Completed
Completion Date:4/15/2013
Spud Date:3/31/2013Spud Date Is:ACTUAL
Measured TD:10082 ft.Measured PB depth:10082 ft.
True Vertical TD:5668 ft.True Vertical PB depth:5668 ft.
Top PZ Location:Sec:24 Twp: 10N 58WFootage: 695 FSL  648 FWL
Bottom Hole Location:Sec:24 Twp: 10N 58WFootage: 694 FNL  617 FWL
Log Types:MUD, CB/GR/CCL, RCBL, Caliper, Density, Triple Combo, AI
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 766, Top: 0 ft., Bottom: 1650 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6455 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 429, Top: 250 ft., Bottom: 6455 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 4764 ft., Depth: 10068 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS5678 ft.
NIOBRARA5981 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2024                  Interval Top: 6155 ft.    Interval Bottom: 10082 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/27/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/16/2013Treatment End Date:5/17/2013
Treatment Summary:18 stage PermStill 45# using 227,740# 40/70 Ottawa sand, 3,607,700# 20/40 Ottawa sand, 360,880# CRC 20/40, 79,028 bbls slickwater. See details on the WB schematic
Total fluid used in treatment (bbls):79028Max pressure during treatment (psi):6711
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):16992
Fresh water used in treatment (bbls):79028Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4196320Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:4606 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/2013Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 555
BTU_GAS 1473
CALC_BBLS_H2O 20
CALC_BBLS_OIL 555
CALC_GOR 230
CALC_MCF_GAS 13
CASING_PRESS 60
GRAVITY_OIL 34
MCF_GAS 13
TUBING_PRESS 2400
Perforation Data:
Interval Top:6155 ft.# Of Holes:
Interval Bottom:10082 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)2052
Total Gas Produced (MCF)9213
GOR4489
GOR DeterminationBOE
Average BOE per Day10.023
Average MCFE per Day58.119

 Federal Financial Assurance  i 

 Tribal Well  i No