Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36521
Well Classification: OW Status: PR - 12/1/2013
Well Name/No:HEDGE #16N-22HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2013
FacilityID:431268LocationID:327202
County:WELD #123Location:NENE 22 3N66W 6
Field:WATTENBERG - #90750Elevation:4907 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:631FNL  344 FELLat/Long: 40.216080 / -104.755034Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.216080 / -104.755025Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/29/2013
End Date: 10/30/2013
Reported: 12/18/2013
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2013             Measured TD: 12088 ft.    Vertical TD: 7126 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/30/2014
Proposed Top PZ Location:Sec:22 Twp: 3N 66W Footage: 688 FNL  691 FEL
Bottom Hole Location:Sec:22 Twp: 3N 66W Footage: 78 FSL  726 FEL
Proposed Depth/Form:12076 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 937 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 0 ft., Bottom: 937 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7518 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 740, Top: 0 ft., Bottom: 7518 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6516 ft., Depth: 12076 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/13/2013
Spud Date:7/27/2013Spud Date Is:ACTUAL
Measured TD:12088 ft.Measured PB depth:12064 ft.
True Vertical TD:7126 ft.True Vertical PB depth:7126 ft.
Top PZ Location:Sec:22 Twp: 3N 66WFootage: 688 FNL  691 FEL
Bottom Hole Location:Sec:22 Twp: 3N 66WFootage: 78 FSL  726 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 953 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 346, Top: 0 ft., Bottom: 953 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 7612 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 768, Top: 182 ft., Bottom: 7612 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6638 ft., Depth: 12073 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7080 ft.
NIOBRARA7165 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2013                 Interval Top: 7645 ft.    Interval Bottom: 12088 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/8/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/29/2013Treatment End Date:10/30/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7645-12088. 47 BBL ACID,13749 BBL CROSSLINK GEL,1430 BBL LINEAR GEL,68480 BBL SLICKWATER,83706 BBL TOTAL FLUID. 412639# 30/50 OTTAWA/ST. PETERS SAND,2025581# 40/70 OTTAWA/ST. PETERS SAND,2438220# TOTAL SAND.
Total fluid used in treatment (bbls):83706Max pressure during treatment (psi):7405
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:34
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):2736Total flowback volume recovered (bbls):1583
Fresh water used in treatment (bbls):80923Disposition method For flowback:RECYCLE
Total proppant used (lbs):2438220Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7164 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 69
BBLS_OIL 207
BTU_GAS 1260
CALC_BBLS_H2O 69
CALC_BBLS_OIL 207
CALC_GOR 6096
CALC_MCF_GAS 1262
CASING_PRESS 1775
GRAVITY_OIL 56
MCF_GAS 1262
TUBING_PRESS 1806
Perforation Data:
Interval Top:7645 ft.# Of Holes:0
Interval Bottom:12088 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2175
Total Gas Produced (MCF)46479
GOR21369
GOR DeterminationMCFE
Average BOE per Day27.752
Average MCFE per Day160.957

 Federal Financial Assurance  i 

 Tribal Well  i No