Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36462
Well Classification: OW Status: PR - 4/29/2020
Well Name/No:BUFFALO #35N-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/29/2020
FacilityID:431179LocationID:431161
County:WELD #123Location:NWNW 15 1N68W 6
Field:WATTENBERG - #90750Elevation:5134 ft.
Planned Location:389FNL  1169 FWLLat/Long: 40.057351 / -104.994954Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.057352 / -104.994955Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/19/2020
End Date: 2/26/2020
Reported: 4/13/2020
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/29/2020             Measured TD: 12228 ft.    Vertical TD: 7653 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/29/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/25/2014
Prop Depth/Form:12178 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1233 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 470, Top: 0 ft., Bottom: 1233 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7978 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 840, Top: 0 ft., Bottom: 7978 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6978 ft., Depth: 12178 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/4/2015
Spud Date:10/24/2014Spud Date Is:ACTUAL
Measured TD:12228 ft.Measured PB depth:12170 ft.
True Vertical TD:7653 ft.True Vertical PB depth:7653 ft.
Top PZ Location:Sec:15 Twp: 1N 68WFootage: 549 FNL  1434 FWLDepth
Bottom Hole Location:Sec:15 Twp: 1N 68WFootage: 485 FSL  1440 FWLDepth
Log Types:CBL, MWD/LWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1329 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 506, Top: 0 ft., Bottom: 1329 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7978 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 46 ft., Bottom: 7978 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7041 ft., Depth: 12218 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 7041 ft., Bottom: 12218 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4773 ft.
SHARON SPRINGS7572 ft.
NIOBRARA7619 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/29/2020                 Interval Top: 7997 ft.    Interval Bottom: 12081 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/7/2020Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/19/2020Treatment End Date:2/26/2020
Treatment Summary:PERF FROM 7997-12081 221 BBLS 15% HCL ACID, 1,538 BBLS PUMP DOWN, 110,840 BBLS SLICKWATER, 112,599 BBLS TOTAL FLUID. 3,307,720 LBS WHITE 40/70 OTTAWA/ST. PETERS, 3,307,720 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):112599Max pressure during treatment (psi):7816
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):221Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4072
Fresh water used in treatment (bbls):112378Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3307720Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7653 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/29/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 158
BBLS_OIL 174
BTU_GAS 1279
CALC_BBLS_H2O 158
CALC_BBLS_OIL 174
CALC_GOR 2132
CALC_MCF_GAS 371
CASING_PRESS 2300
GRAVITY_OIL 47
MCF_GAS 371
TUBING_PRESS 2000
Perforation Data:
Interval Top:7997 ft.# Of Holes:450
Interval Bottom:12081 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)5622
Total Gas Produced (MCF)61226
GOR10890
GOR DeterminationBOE
Average BOE per Day44.206
Average MCFE per Day256.394

 Federal Financial Assurance  i 

 Tribal Well  i No