Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36461
Well Classification: OW Status: PR - 4/20/2020
Well Name/No:BUFFALO #13N-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/20/2020
FacilityID:431178LocationID:431161
County:WELD #123Location:NWNW 15 1N68W 6
Field:WATTENBERG - #90750Elevation:5159 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:393FNL  953 FWLLat/Long: 40.057339 / -104.995811Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.057338 / -104.995812Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/26/2020
End Date: 3/3/2020
Reported: 4/13/2020
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/20/2020             Measured TD: 12295 ft.    Vertical TD: 7770 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/20/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/25/2014
Proposed Top PZ Location:Sec:15 Twp: 1N 68W Footage: 658 FNL  797 FWL
Bottom Hole Location:Sec:15 Twp: 1N 68W Footage: 485 FSL  863 FWL
Proposed Depth/Form:12300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1239 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 470, Top: 0 ft., Bottom: 1239 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8099 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 860, Top: 0 ft., Bottom: 8099 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7099 ft., Depth: 12300 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/14/2015
Spud Date:10/30/2014Spud Date Is:ACTUAL
Measured TD:12295 ft.Measured PB depth:12196 ft.
True Vertical TD:7770 ft.True Vertical PB depth:7770 ft.
Top PZ Location:Sec:15 Twp: 1N 68WFootage: 658 FNL  797 FWL
Bottom Hole Location:Sec:15 Twp: 1N 68WFootage: 485 FSL  863 FWL
Log Types:CBL, MWD/LWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1322 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 549, Top: 0 ft., Bottom: 1322 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8150 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 0 ft., Bottom: 8150 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7112 ft., Depth: 12290 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 7112 ft., Bottom: 12290 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4792 ft.
SHARON SPRINGS7596 ft.
NIOBRARA7659 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/20/2020                 Interval Top: 8175 ft.    Interval Bottom: 12157 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/25/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/26/2020Treatment End Date:3/3/2020
Treatment Summary:PERF FROM 8175-12157 262 BBLS 15% HCL ACID, 1,831 BBLS PUMP DOWN, 111,463 BBLS SLICKWATER, 113,556 BBLS TOTAL FLUID. 3,229,000 LBS WHITE 40/70 OTTAWA/ST. PETERS, 3,229,000 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):113556Max pressure during treatment (psi):7828
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):262Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):800Total flowback volume recovered (bbls):8292
Fresh water used in treatment (bbls):112494Disposition method For flowback:RECYCLE
Total proppant used (lbs):3229000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7708 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 400
BBLS_OIL 131
BTU_GAS 1279
CALC_BBLS_H2O 400
CALC_BBLS_OIL 131
CALC_GOR 2573
CALC_MCF_GAS 337
CASING_PRESS 2500
GRAVITY_OIL 47
MCF_GAS 337
TUBING_PRESS 1700
Perforation Data:
Interval Top:8175 ft.# Of Holes:450
Interval Bottom:12157 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4942
Total Gas Produced (MCF)43282
GOR8757
GOR DeterminationBOE
Average BOE per Day34.038
Average MCFE per Day197.423

 Federal Financial Assurance  i 

 Tribal Well  i No