Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36460
Well Classification: OW Status: PR - 5/4/2020
Well Name/No:BUFFALO #36C-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/4/2020
FacilityID:431177LocationID:431161
County:WELD #123Location:NENW 15 1N68W 6
Field:WATTENBERG - #90750Elevation:5153 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:383FNL  1463 FWLLat/Long: 40.057365 / -104.993989Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.057366 / -104.993989Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/7/2020
End Date: 2/9/2020
Reported: 4/3/2020
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/4/2020             Measured TD: 12479 ft.    Vertical TD: 7888 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/4/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/25/2014
Proposed Top PZ Location:Sec:15 Twp: 1N 68W Footage: 658 FNL  2498 FWL
Bottom Hole Location:Sec:15 Twp: 1N 68W Footage: 495 FSL  2488 FWL
Proposed Depth/Form:12509 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1226 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 470, Top: 0 ft., Bottom: 1226 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8315 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 880, Top: 0 ft., Bottom: 8315 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7312 ft., Depth: 12509 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/2/2015
Spud Date:10/17/2014Spud Date Is:ACTUAL
Measured TD:12479 ft.Measured PB depth:12423 ft.
True Vertical TD:7888 ft.True Vertical PB depth:7888 ft.
Top PZ Location:Sec:15 Twp: 1N 68WFootage: 658 FNL  2498 FWL
Bottom Hole Location:Sec:15 Twp: 1N 68WFootage: 495 FSL  2488 FWL
Log Types:CBL, MWD/LWD, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1275 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 542, Top: 0 ft., Bottom: 1275 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8347 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 728, Top: 150 ft., Bottom: 8347 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7303 ft., Depth: 12469 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 282, Top: 7303 ft., Bottom: 12469 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4833 ft.
SHARON SPRINGS7591 ft.
NIOBRARA7633 ft.
FORT HAYS8152 ft.
CODELL8233 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/21/2020                 Interval Top: 10179 ft.    Interval Bottom: 11735 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:10179-11735
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10179 ft.# Of Holes:240
Interval Bottom:11735 ft.Hole Size:0.44 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 5/4/2020                  Interval Top: 8367 ft.    Interval Bottom: 12389 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/7/2020Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/7/2020Treatment End Date:2/9/2020
Treatment Summary:PERF FROM 8367-12389 238 BBLS 15% HCL ACID, 1,084 BBLS PUMP DOWN, 75,195 BBLS SLICKWATER, 76,517 BBLS TOTAL FLUID. 2,161,490 LBS BROWN 40/140, 69,440 LBS WHITE 40/70 OTTAWA/ST PETERS, 2,230,930 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):76517Max pressure during treatment (psi):7811
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):238Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6216
Fresh water used in treatment (bbls):76279Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2230930Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7883 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/4/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 173
BBLS_OIL 250
BTU_GAS 1279
CALC_BBLS_H2O 173
CALC_BBLS_OIL 250
CALC_GOR 3304
CALC_MCF_GAS 826
CASING_PRESS 2400
GRAVITY_OIL 47
MCF_GAS 826
TUBING_PRESS 1800
Perforation Data:
Interval Top:8367 ft.# Of Holes:240
Interval Bottom:12389 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/21/2020                 Interval Top: 8367 ft.    Interval Bottom: 12389 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:8367-10179, 11735-12389
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8367 ft.# Of Holes:240
Interval Bottom:12389 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)6324
Total Gas Produced (MCF)67078
GOR10606
GOR DeterminationBOE
Average BOE per Day48.965
Average MCFE per Day283.985

 Federal Financial Assurance  i 

 Tribal Well  i No