Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36454
Well Classification: OW Status: PR - 3/1/2020
Well Name/No:BUFFALO #35C-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2020
FacilityID:431171LocationID:431161
County:WELD #123Location:NWNW 15 1N68W 6
Field:WATTENBERG - #90750Elevation:5159 ft.
Planned Location:393FNL  983 FWLLat/Long: 40.057341 / -104.995704Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.057340 / -104.995704Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/27/2020
End Date: 3/1/2020
Reported: 4/13/2020
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2020             Measured TD: 12427 ft.    Vertical TD: 7914 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/25/2014
Prop Depth/Form:12436 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1239 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 470, Top: 0 ft., Bottom: 1239 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8238 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 870, Top: 0 ft., Bottom: 8238 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7238 ft., Depth: 12436 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/6/2015
Spud Date:10/29/2014Spud Date Is:ACTUAL
Measured TD:12427 ft.Measured PB depth:12370 ft.
True Vertical TD:7914 ft.True Vertical PB depth:7914 ft.
Top PZ Location:Sec:15 Twp: 1N 68WFootage: 690 FNL  1190 FWLDepth
Bottom Hole Location:Sec:15 Twp: 1N 68WFootage: 483 FSL  1245 FWLDepth
Log Types:CBL, MWD/LWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1307 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 809, Top: 0 ft., Bottom: 1307 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8288 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 8288 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7301 ft., Depth: 12418 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 7301 ft., Bottom: 12418 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4789 ft.
SHARON SPRINGS7579 ft.
NIOBRARA7627 ft.
FORT HAYS8135 ft.
CODELL8213 ft.
CARLILE9580 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/21/2020                 Interval Top: 11399 ft.    Interval Bottom: 11440 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:11399-11440
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11399 ft.# Of Holes:240
Interval Bottom:11440 ft.Hole Size:0.44 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/21/2020                 Interval Top: 9580 ft.    Interval Bottom: 9769 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:9580-9769
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9580 ft.# Of Holes:240
Interval Bottom:9769 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/21/2020                 Interval Top: 8307 ft.    Interval Bottom: 12282 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/26/2020Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/27/2020Treatment End Date:3/1/2020
Treatment Summary:PERF FROM 8307-12282 238 BBLS 15% HCL ACID, 958 BBLS PUMP DOWN, 73,279 BBLS SLICKWATER, 74,475 BBLS TOTAL FLUID. 2,208,800 LBS WHITE 30/50 OTTAWA/ST. PETERS, 2,208,800 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):74475Max pressure during treatment (psi):7718
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):238Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):760Total flowback volume recovered (bbls):4325
Fresh water used in treatment (bbls):73477Disposition method For flowback:RECYCLE
Total proppant used (lbs):2208800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7840 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 400
BBLS_OIL 276
BTU_GAS 1279
CALC_BBLS_H2O 400
CALC_BBLS_OIL 276
CALC_GOR 2667
CALC_MCF_GAS 736
CASING_PRESS 2500
GRAVITY_OIL 47
MCF_GAS 736
TUBING_PRESS 2500
Perforation Data:
Interval Top:8307 ft.# Of Holes:240
Interval Bottom:12282 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/21/2020                 Interval Top: 8307 ft.    Interval Bottom: 12282 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:8307-9580, 9769-11399, 11440-12282
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8307 ft.# Of Holes:240
Interval Bottom:12282 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)5622
Total Gas Produced (MCF)61226
GOR10890
GOR DeterminationBOE
Average BOE per Day44.206
Average MCFE per Day256.394

 Federal Financial Assurance  i 

 Tribal Well  i No