|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 3/1/2022 Measured TD: 10278 ft. Vertical TD: 5989 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 3/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/10/2014 | Prop Depth/Form: | 10260 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: Sect 23 All | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 600 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 0 ft., Bottom: 600 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6403 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 440, Top: , Bottom: 6403 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6253 ft., Depth: 10260 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 1/20/2013 | Spud Date: | 1/13/2013 | Spud Date Is: | ACTUAL | Measured TD: | 10278 ft. | Measured PB depth: | 10250 ft. | True Vertical TD: | 5989 ft. | True Vertical PB depth: | 5961 ft. | Top PZ Location: | Sec:23 Twp: 9N 59W | Footage: 688 FSL 873 FWL | Depth | Bottom Hole Location: | Sec:23 Twp: 9N 9W | Footage: 670 FSL 659 FEL | Depth | Log Types: | CBL, GR, Mud. | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 124 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 673 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 321, Top: 0 ft., Bottom: 673 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 6434 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 890 ft., Bottom: 6434 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6299 ft., Depth: 10252 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2388 ft. | | | | PARKMAN | 3412 ft. | | | | SUSSEX | 4124 ft. | | | | SHANNON | 4547 ft. | | | | NIOBRARA | 6061 ft. | | | |
Formation NBRR Formation Classification: OW Status: TA - 3/1/2022 Interval Top: 6580 ft. Interval Bottom: 10170 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/5/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 2/20/2013 | Treatment End Date: | 2/20/2013 | Treatment Summary: | Frac'd the Niobrara w/2298316 gals of Silverstim and Slick Water with 3924866#'s of Ottawa sand. | Total fluid used in treatment (bbls): | 54721 | Max pressure during treatment (psi): | 3467 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 19 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.93 | Recycled water used in treatment (bbls): | 3991 | Total flowback volume recovered (bbls): | 9922 | Fresh water used in treatment (bbls): | 50729 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 978 | BBLS_OIL | 419 | BTU_GAS | 1345 | CALC_BBLS_H2O | 978 | CALC_BBLS_OIL | 419 | CALC_GOR | 1195 | CALC_MCF_GAS | 501 | CASING_PRESS | 588 | GRAVITY_OIL | 36 | MCF_GAS | 501 | TUBING_PRESS | 358 |
| Perforation Data: | Interval Top: | 6580 ft. | # Of Holes: | 19 | Interval Bottom: | 10170 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 12/08/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 02/28/2017 |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|