Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36392
Well Classification: OW Status: TA - 3/1/2022
Well Name/No:Castor Federal #LC23-62HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date3/1/2022
FacilityID:431061LocationID:431062
County:WELD #123Location:SWSW 23 9N59W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4847 ft.
Planned Location:400FSL  460 FWLLat/Long: 40.730139 / -103.952931Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.730139 / -103.952931Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/22/2013
End Date: 2/22/2013
Reported: 7/19/2013
Days to report: 147
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 3/1/2022             Measured TD: 10278 ft.    Vertical TD: 5989 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 3/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/10/2014
Prop Depth/Form:10260 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: Sect 23 All
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 600 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6403 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 440, Top: , Bottom: 6403 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6253 ft., Depth: 10260 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/20/2013
Spud Date:1/13/2013Spud Date Is:ACTUAL
Measured TD:10278 ft.Measured PB depth:10250 ft.
True Vertical TD:5989 ft.True Vertical PB depth:5961 ft.
Top PZ Location:Sec:23 Twp: 9N 59WFootage: 688 FSL  873 FWLDepth
Bottom Hole Location:Sec:23 Twp: 9N 9WFootage: 670 FSL  659 FELDepth
Log Types:CBL, GR, Mud.
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 124 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 124 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 673 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 321, Top: 0 ft., Bottom: 673 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 6434 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 890 ft., Bottom: 6434 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6299 ft., Depth: 10252 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2388 ft.
PARKMAN3412 ft.
SUSSEX4124 ft.
SHANNON4547 ft.
NIOBRARA6061 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  TA - 3/1/2022                  Interval Top: 6580 ft.    Interval Bottom: 10170 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/5/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/20/2013Treatment End Date:2/20/2013
Treatment Summary:Frac'd the Niobrara w/2298316 gals of Silverstim and Slick Water with 3924866#'s of Ottawa sand.
Total fluid used in treatment (bbls):54721Max pressure during treatment (psi):3467
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):3991Total flowback volume recovered (bbls):9922
Fresh water used in treatment (bbls):50729Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 978
BBLS_OIL 419
BTU_GAS 1345
CALC_BBLS_H2O 978
CALC_BBLS_OIL 419
CALC_GOR 1195
CALC_MCF_GAS 501
CASING_PRESS 588
GRAVITY_OIL 36
MCF_GAS 501
TUBING_PRESS 358
Perforation Data:
Interval Top:6580 ft.# Of Holes:19
Interval Bottom:10170 ft.Hole Size:
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
12/08/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
02/28/2017
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No