Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36324
Well Classification: OW Status: PA - 10/22/2025
Well Name/No:Campbell JF #17-41D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/22/2025
FacilityID:430904LocationID:430790
County:WELD #123Location:SWNE 17 2N65W 6
Field:WATTENBERG - #90750Elevation:4916 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1512FNL  1465 FELLat/Long: 40.141808 / -104.683639Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.141810 / -104.683537Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/23/2013
End Date: 5/23/2013
Reported: 5/13/2014
Days to report: 355
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/22/2025             Measured TD: 7623 ft.    Vertical TD: 7419 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/22/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/28/2014
Proposed Top PZ Location:Sec:17 Twp: 2N 65W Footage: 1320 FNL  0 FEL
Bottom Hole Location:Sec:17 Twp: 2N 65W Footage: 1320 FNL  0 FEL
Proposed Depth/Form:7632 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 907 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 419, Top: 0 ft., Bottom: 907 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7632 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 751, Top: 3614 ft., Bottom: 7632 ft.

Wellbore Completed
Completion Date:2/2/2013
Spud Date:1/29/2013Spud Date Is:ACTUAL
Measured TD:7623 ft.Measured PB depth:7581 ft.
True Vertical TD:7419 ft.True Vertical PB depth:7377 ft.
Top PZ Location:Sec:17 Twp: 2N 65WFootage: 1320 FNL  0 FEL
Bottom Hole Location:Sec:17 Twp: 2N 65WFootage: 1320 FNL  0 FEL
Log Types:CBL & Triple Combination
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 953 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 953 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7594 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 2040 ft., Bottom: 7594 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
CODELL7460 ft.
FORT HAYS7439 ft.
GREELEY SAND2914 ft.
NIOBRARA7184 ft.
PARKMAN4160 ft.
SUSSEX4520 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/25/2024                 Interval Top: 7462 ft.    Interval Bottom: 7474 ft.

 Completed Information for Formation CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/23/2013Treatment End Date:5/23/2013
Treatment Summary:Total 92,080 lbs 20/40 White Sand, & 4,000 lbs 20/40 SLC. Slickwater pumped 2581 bbls. Flowback determined from well test seperator.
Total fluid used in treatment (bbls):2581Max pressure during treatment (psi):5208
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):763
Fresh water used in treatment (bbls):2581Disposition method For flowback:DISPOSAL
Total proppant used (lbs):96080Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7462 ft.# Of Holes:48
Interval Bottom:7474 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/22/2025                Interval Top: 7238 ft.    Interval Bottom: 7474 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 65
BTU_GAS 1263
CALC_BBLS_H2O 1
CALC_BBLS_OIL 65
CALC_GOR 3646
CALC_MCF_GAS 237
CASING_PRESS 990
GRAVITY_OIL 49
MCF_GAS 237
Perforation Data:
Interval Top:7238 ft.# Of Holes:138
Interval Bottom:7474 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/25/2024                 Interval Top: 7238 ft.    Interval Bottom: 7364 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/20/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/23/2013Treatment End Date:5/23/2013
Treatment Summary:Total 200,560 lbs 40/70 White Sand, 4,000 lbs 20/40 SLC. Pumped 24 bbls 15% HCl. Slickwater pumped 5383 bbls. Flowback determined from well test seperator.
Total fluid used in treatment (bbls):5407Max pressure during treatment (psi):4665
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):763
Fresh water used in treatment (bbls):5383Disposition method For flowback:DISPOSAL
Total proppant used (lbs):204560Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7238 ft.# Of Holes:90
Interval Bottom:7364 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/22/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
03/31/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
02/09/2024
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No