Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36297
Well Classification: OW Status: PA - 8/11/2020
Well Name/No:Campbell JF #17-8D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/11/2020
FacilityID:430781LocationID:430790
County:WELD #123Location:SWNE 17 2N65W 6
Field:WATTENBERG - #90750Elevation:4916 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1512FNL  1480 FELLat/Long: 40.141808 / -104.683694Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.141809 / -104.683640Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/31/2013
End Date: 5/31/2013
Reported: 5/13/2014
Days to report: 347
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/11/2020             Measured TD: 7510 ft.    Vertical TD: 7420 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/11/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/14/2014
Proposed Top PZ Location:Sec:17 Twp: 2N 65W Footage: 1980 FNL  660 FEL
Bottom Hole Location:Sec:17 Twp: 2N 65W Footage: 1980 FNL  660 FEL
Proposed Depth/Form:7514 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S/2NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 901 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 416, Top: 0 ft., Bottom: 901 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7514 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 744, Top: 3535 ft., Bottom: 7514 ft.

Wellbore Completed
Completion Date:1/28/2013
Spud Date:1/24/2013Spud Date Is:ACTUAL
Measured TD:7510 ft.Measured PB depth:7481 ft.
True Vertical TD:7420 ft.True Vertical PB depth:7390 ft.
Top PZ Location:Sec:17 Twp: 2N 65WFootage: 1980 FNL  660 FEL
Bottom Hole Location:Sec:17 Twp: 2N 65WFootage: 1980 FNL  660 FEL
Log Types:Triple Combination, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 943 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 943 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7495 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 1690 ft., Bottom: 7495 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2872 ft.
PARKMAN4094 ft.4094 ft.
SUSSEX4637 ft.
NIOBRARA7080 ft.
FORT HAYS7334 ft.
CODELL7357 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/23/2014                 Interval Top: 7358 ft.    Interval Bottom: 7371 ft.

 Completed Information for Formation CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/31/2013Treatment End Date:5/31/2013
Treatment Summary:Total 186,000 lbs, white sand 20/40 super LC 20/40 Total fluid 3105 bbls.
Total fluid used in treatment (bbls):3105Max pressure during treatment (psi):4407
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1163
Fresh water used in treatment (bbls):3105Disposition method For flowback:DISPOSAL
Total proppant used (lbs):186000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7358 ft.# Of Holes:47
Interval Bottom:7371 ft.Hole Size:0.35 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/27/2019                 Interval Top: 7130 ft.    Interval Bottom: 7371 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 13
BTU_GAS 1263
CALC_BBLS_H2O 13
CALC_MCF_GAS 8
CASING_PRESS 1699
GRAVITY_OIL 49
MCF_GAS 8
TUBING_PRESS 995
Perforation Data:
Interval Top:7130 ft.# Of Holes:98
Interval Bottom:7371 ft.Hole Size:0.35 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/23/2014                 Interval Top: 7130 ft.    Interval Bottom: 7236 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/20/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/31/2013Treatment End Date:5/31/2013
Treatment Summary:Total 199960 lbs, white sand 40-70, super LC 20-40. Total fluid 5471 bbls.
Total fluid used in treatment (bbls):5471Max pressure during treatment (psi):4832
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1163
Fresh water used in treatment (bbls):5471Disposition method For flowback:DISPOSAL
Total proppant used (lbs):199960Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7130 ft.# Of Holes:51
Interval Bottom:7236 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/11/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No