|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2020 Measured TD: 7830 ft. Vertical TD: 7747 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/29/2014 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 65W | Footage: 550 FNL 563 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 65W | Footage: 544 FNL 566 FEL | | Proposed Depth/Form: | 7807 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7807 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 6739 ft., Bottom: 7807 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4775 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 90, Top: 4143 ft., Bottom: 4775 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/28/2012 | | Spud Date: | 10/24/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7830 ft. | Measured PB depth: | 7773 ft. | | True Vertical TD: | 7747 ft. | True Vertical PB depth: | 7690 ft. | | Top PZ Location: | Sec:10 Twp: 2N 65W | Footage: 550 FNL 563 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 65W | Footage: 544 FNL 566 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 920 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 930 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7819 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 3040 ft., Bottom: 7830 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4384 ft. | | | | | NIOBRARA | 6922 ft. | | | | | CODELL | 7203 ft. | | | | | J SAND | 7657 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7662 ft. Interval Bottom: 7698 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/13/2012 | Treatment End Date: | 12/12/2012 | | Treatment Summary: | Frac'd the J Sand with 251,060# 20/40 sand with 119,574 gals SLF. 12-13-12 | | Total fluid used in treatment (bbls): | 2847 | Max pressure during treatment (psi): | 3278 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | 2847 | Total flowback volume recovered (bbls): | 367 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 251060 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7662 ft. | # Of Holes: | 50 | | Interval Bottom: | 7698 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/15/2013 Interval Top: 7204 ft. Interval Bottom: 7218 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/13/2012 | Treatment End Date: | 12/14/2012 | | Treatment Summary: | Set CFP @ 7263'. 12-13-12
Frac'd the Codell with 251,220# sand with 79,170 gals SLF. 12-14-12
| | Total fluid used in treatment (bbls): | 1885 | Max pressure during treatment (psi): | 5282 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | 1885 | Total flowback volume recovered (bbls): | 367 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 251220 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7204 ft. | # Of Holes: | 42 | | Interval Bottom: | 7218 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/29/2013 Interval Top: 6972 ft. Interval Bottom: 7698 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/29/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 6900'. 01-08-13
Drilled up CBP, CFP's to commingle the JSND-NBRR-CDL. 01-09-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7632 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/29/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 63 | | BBLS_OIL | 17 | | BTU_GAS | 1139 | | CALC_BBLS_H2O | 63 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 6059 | | CALC_MCF_GAS | 103 | | CASING_PRESS | 1180 | | GRAVITY_OIL | 38 | | MCF_GAS | 103 | | TUBING_PRESS | 326 |
| | Perforation Data: | | Interval Top: | 6972 ft. | # Of Holes: | 140 | | Interval Bottom: | 7698 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 6972 ft. Interval Bottom: 7218 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6972 ft. | # Of Holes: | 90 | | Interval Bottom: | 7218 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/15/2013 Interval Top: 6972 ft. Interval Bottom: 6984 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/13/2012 | Treatment End Date: | 12/14/2012 | | Treatment Summary: | Set CFP @ 7050'. 12-14-12
Frac'd the Niobrara with 250380# 20/40 sand with 90,762 gals SLF. 12-14-12 | | Total fluid used in treatment (bbls): | 2161 | Max pressure during treatment (psi): | 5246 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | 2161 | Total flowback volume recovered (bbls): | 367 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250380 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6972 ft. | # Of Holes: | 48 | | Interval Bottom: | 6984 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 215 |
| Total Gas Produced (MCF) | 8015 |
| GOR | 37279 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.112 |
| Average MCFE per Day | 23.837 |
| Federal Financial Assurance | i | |
|
|