|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2022 Measured TD: 7958 ft. Vertical TD: 7729 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/29/2014 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 65W | Footage: 2410 FNL 546 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 65W | Footage: 2411 FNL 552 FEL | | Proposed Depth/Form: | 7954 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7954 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 6885 ft., Bottom: 7954 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4890 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 4246 ft., Bottom: 4890 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/1/2012 | | Spud Date: | 10/28/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7958 ft. | Measured PB depth: | 7873 ft. | | True Vertical TD: | 7729 ft. | True Vertical PB depth: | 7644 ft. | | Top PZ Location: | Sec:10 Twp: 2N 65W | Footage: 2410 FNL 546 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 65W | Footage: 2411 FNL 552 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 920 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 920 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7958 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 3150 ft., Bottom: 7958 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4529 ft. | | | | | NIOBRARA | 7048 ft. | | | | | CODELL | 7332 ft. | | | | | J SAND | 7772 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 11/1/2022 Interval Top: 7776 ft. Interval Bottom: 7822 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/12/2012 | Treatment End Date: | 12/13/2012 | | Treatment Summary: | Frac'd the J Sand with 250,740# 20/40 sand with 117,852 gals SLF. 12-12-12 | | Total fluid used in treatment (bbls): | 2806 | Max pressure during treatment (psi): | 3520 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.72 | | Recycled water used in treatment (bbls): | 2806 | Total flowback volume recovered (bbls): | 302 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250740 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7776 ft. | # Of Holes: | 50 | | Interval Bottom: | 7822 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/15/2013 Interval Top: 7333 ft. Interval Bottom: 7347 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/12/2012 | Treatment End Date: | 12/13/2012 | | Treatment Summary: | Set CFP @ 7400'. 12-12-12
Frac'd the Codell with 250,100# 20/40 sand with 80,304 gals SLF. 12-12-12 | | Total fluid used in treatment (bbls): | 1912 | Max pressure during treatment (psi): | 4990 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.92 | | Recycled water used in treatment (bbls): | 1912 | Total flowback volume recovered (bbls): | 302 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250100 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7333 ft. | # Of Holes: | 42 | | Interval Bottom: | 7347 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/29/2013 Interval Top: 7102 ft. Interval Bottom: 7822 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/29/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 6976'. 01-10-13
Drilled up CBP, CFP's to commingle the JSND-NBRR-CDL. 01-11-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7751 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/29/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 63 | | BBLS_OIL | 54 | | BTU_GAS | 1139 | | CALC_BBLS_H2O | 63 | | CALC_BBLS_OIL | 54 | | CALC_GOR | 4426 | | CALC_MCF_GAS | 239 | | CASING_PRESS | 1184 | | MCF_GAS | 239 | | TUBING_PRESS | 590 |
| | Perforation Data: | | Interval Top: | 7102 ft. | # Of Holes: | 134 | | Interval Bottom: | 7822 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 11/1/2022 Interval Top: 7102 ft. Interval Bottom: 7347 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7102 ft. | # Of Holes: | 84 | | Interval Bottom: | 7347 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/15/2013 Interval Top: 7102 ft. Interval Bottom: 7114 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/24/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/23/2012 | Treatment End Date: | 12/24/2012 | | Treatment Summary: | Set CFP @ 7164'. 12-12-12
Frac'd the Niobrara with 251,160# 20/40 sand with 90,636 gals SLF. 12-12-12
| | Total fluid used in treatment (bbls): | 2158 | Max pressure during treatment (psi): | 4908 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | 2158 | Total flowback volume recovered (bbls): | 302 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 251160 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7102 ft. | # Of Holes: | 42 | | Interval Bottom: | 7114 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 10/31/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|