|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/3/2019 Measured TD: 11923 ft. Vertical TD: 7256 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/3/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/21/2014 | | Proposed Top PZ Location: | Sec:6 Twp: 6N 66W | Footage: 993 FNL 794 FEL | | Bottom Hole Location: | Sec:6 Twp: 6N 66W | Footage: 990 FNL 535 FWL | | Proposed Depth/Form: | 11668 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 910 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 419, Top: 0 ft., Bottom: 910 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7605 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 532, Top: 0 ft., Bottom: 7605 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7500 ft., Depth: 11668 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 3/5/2014 | | Spud Date: | 2/19/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11923 ft. | Measured PB depth: | 11923 ft. | | True Vertical TD: | 7256 ft. | True Vertical PB depth: | 7256 ft. | | Top PZ Location: | Sec:6 Twp: 6N 66W | Footage: 1093 FNL 632 FEL | | Bottom Hole Location: | Sec:6 Twp: 6N 66W | Footage: 978 FNL 537 FWL | | Log Types: | CBL, MUD, GR | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1002 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 423, Top: 0 ft., Bottom: 1002 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7621 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 180 ft., Bottom: 7621 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7527 ft., Depth: 11908 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 973 ft. | | | | | PARKMAN | 3738 ft. | | | | | SUSSEX | 4313 ft. | | | | | SHANNON | 4958 ft. | | | | | TEEPEE BUTTES | 6307 ft. | | | | | NIOBRARA | 7269 ft. | | | |
Formation NBRR Formation Classification: OW Status: AB - 6/3/2019 Interval Top: 7759 ft. Interval Bottom: 11831 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/24/2014 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/4/2014 | Treatment End Date: | 4/6/2014 | | Treatment Summary: | FRAC'D W/3386099 GALS SILVERSTIM, 25# LINEAR GEL AND SLICK WATER AND 4104835# OTTAWA SAND | | Total fluid used in treatment (bbls): | 80621 | Max pressure during treatment (psi): | 6185 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 21 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 1.00 | | Recycled water used in treatment (bbls): | 4455 | Total flowback volume recovered (bbls): | 3371 | | Fresh water used in treatment (bbls): | 76166 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 4104835 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7495 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/6/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 204 | | BBLS_OIL | 375 | | BTU_GAS | 1120 | | CALC_BBLS_H2O | 204 | | CALC_BBLS_OIL | 375 | | CALC_GOR | 640 | | CALC_MCF_GAS | 240 | | CASING_PRESS | 1460 | | GRAVITY_OIL | 40 | | MCF_GAS | 240 | | TUBING_PRESS | 636 |
| | Perforation Data: | | Interval Top: | 7759 ft. | # Of Holes: | 0 | | Interval Bottom: | 11831 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/03/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|