Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35918
Well Classification: OW Status: PR - 5/1/2013
Well Name/No:NICHOLS #4N-5HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2013
FacilityID:429788LocationID:429787
County:WELD #123Location:SWNW 8 2N65W 6
Field:WATTENBERG - #90750Elevation:4946 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2399FNL  280 FWLLat/Long: 40.153914 / -104.696171Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.153917 / -104.696174Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/25/2013
End Date: 3/27/2013
Reported: 6/6/2013
Days to report: 71
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/28/2013             Measured TD: 14159 ft.    Vertical TD: 7132 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/28/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/30/2014
Proposed Top PZ Location:Sec:8 Twp: 2N 65W Footage: 1825 FNL  502 FWL
Bottom Hole Location:Sec:5 Twp: 2N 65W Footage: 460 FNL  545 FWL
Proposed Depth/Form:13967 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 920 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 620, Top: 0 ft., Bottom: 920 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7438 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7438 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6436 ft., Depth: 13967 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/5/2013
Spud Date:11/14/2012Spud Date Is:ACTUAL
Measured TD:14159 ft.Measured PB depth:14140 ft.
True Vertical TD:7132 ft.True Vertical PB depth:7131 ft.
Top PZ Location:Sec:8 Twp: 2N 65WFootage: 1973 FNL  494 FWL
Bottom Hole Location:Sec:5 Twp: 2N 65WFootage: 485 FNL  631 FWL
Log Types:PRE FORM 5
Log Types:CBL; MWD: GR, PR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 960 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 960 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7502 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 716, Top: 200 ft., Bottom: 7502 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6534 ft., Depth: 14169 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7041 ft.
NIOBRARA7164 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2013                  Interval Top: 7538 ft.    Interval Bottom: 14159 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/14/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/25/2013Treatment End Date:3/27/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7538-14159. 20839 BBL CROSSLINK GEL, 2105 BBL LINEAR GEL, 101890 BBL SLICKWATER, 124834 BBL TOTAL FLUID. 2469543# 40/70 SAND, 649500# 30/50 SAND, 55276# 20/40 SAND, 3174319# TOTAL SAND.
Total fluid used in treatment (bbls):124834Max pressure during treatment (psi):7504
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10428
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3174319Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7055 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 305
BBLS_OIL 398
BTU_GAS 1279
CALC_BBLS_H2O 305
CALC_BBLS_OIL 398
CALC_GOR 1872
CALC_MCF_GAS 745
CASING_PRESS 2530
GRAVITY_OIL 51
MCF_GAS 745
TUBING_PRESS 1563
Perforation Data:
Interval Top:7538 ft.# Of Holes:0
Interval Bottom:14159 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)643
Total Gas Produced (MCF)4281
GOR6657
GOR DeterminationBOE
Average BOE per Day3.757
Average MCFE per Day21.776

 Federal Financial Assurance  i 

 Tribal Well  i No