Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35901
Well Classification: OW Status: PA - 1/14/2016
Well Name/No:DOVE #5N-13HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/14/2016
FacilityID:429765LocationID:429767
County:WELD #123Location:NWNW 12 2N66W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:500FNL  590 FWLLat/Long: 40.158768 / -104.732747Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.158774 / -104.732756Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/11/2013
End Date: 10/13/2013
Reported: 11/26/2013
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 1/14/2016             Measured TD: 14514 ft.    Vertical TD: 7304 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 1/14/2016
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/30/2014
Proposed Top PZ Location:Sec:12 Twp: 2N 66W Footage: 675 FNL  1111 FWL
Bottom Hole Location:Sec:13 Twp: 2N 66W Footage: 2208 FNL  1054 FWL
Proposed Depth/Form:13816 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 750, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7649 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 740, Top: 0 ft., Bottom: 7649 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6649 ft., Depth: 13816 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/19/2013
Spud Date:3/10/2013Spud Date Is:ACTUAL
Measured TD:14514 ft.Measured PB depth:14446 ft.
True Vertical TD:7304 ft.True Vertical PB depth:7308 ft.
Top PZ Location:Sec:12 Twp: 2N 66WFootage: 657 FNL  1063 FWL
Bottom Hole Location:Sec:13 Twp: 2N 66WFootage: 2205 FNL  1159 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1030 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 396, Top: 0 ft., Bottom: 1030 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7689 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 205, Top: 6215 ft., Bottom: 7697 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6215 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 6215 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: , Depth: 14494 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 593, Top: 0 ft., Bottom: 6585 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6586 ft., Depth: 14494 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7164 ft.
NIOBRARA7264 ft.

Formation NBRR                     Formation Classification:  SI                     Status:  AB - 11/3/2016                 Interval Top: 13000 ft.    Interval Bottom: 14362 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/11/2013Treatment End Date:10/13/2013
Treatment Summary:"PERF AND FRAC FROM 13,000-14,362. 172 BBL ACID, 30,966 BBL SLICKWATER, - 31,138 BBL TOTAL FLUID 777,380# 40/70 OTTAWA/ST. PETERS, - 777,380# TOTAL SAND."
Total fluid used in treatment (bbls):31138Max pressure during treatment (psi):7308
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):172Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):50
Fresh water used in treatment (bbls):30966Disposition method For flowback:DISPOSAL
Total proppant used (lbs):777380Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:13000 ft.# Of Holes:204
Interval Bottom:14362 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/14/2016
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No