Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35892
Well Classification: OW Status: PR - 11/29/2013
Well Name/No:VONDERLAGE #29N-W31HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/29/2013
FacilityID:429754LocationID:336506
County:WELD #123Location:SWSW 31 3N66W 6
Field:WATTENBERG - #90750Elevation:4826 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:416FSL  476 FWLLat/Long: 40.175131 / -104.827794Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.175135 / -104.827800Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/20/2013
End Date: 11/22/2013
Reported: 1/15/2014
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/29/2013             Measured TD: 11658 ft.    Vertical TD: 7186 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/29/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/29/2014
Proposed Top PZ Location:Sec:31 Twp: 3N 66W Footage: 641 FSL  1072 FWL
Bottom Hole Location:Sec:31 Twp: 3N 66W Footage: 485 FNL  968 FWL
Proposed Depth/Form:11672 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 630, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7548 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 740, Top: 0 ft., Bottom: 7548 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6505 ft., Depth: 11672 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/31/2013
Spud Date:6/10/2013Spud Date Is:ACTUAL
Measured TD:11658 ft.Measured PB depth:11639 ft.
True Vertical TD:7186 ft.True Vertical PB depth:7186 ft.
Top PZ Location:Sec:31 Twp: 3N 66WFootage: 641 FSL  1072 FWL
Bottom Hole Location:Sec:31 Twp: 3N 66WFootage: 485 FNL  968 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 894 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 318, Top: 0 ft., Bottom: 894 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7560 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 763, Top: 520 ft., Bottom: 7560 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6566 ft., Depth: 11648 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7073 ft.
NIOBRARA7193 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/29/2013                Interval Top: 7618 ft.    Interval Bottom: 11658 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/30/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/20/2013Treatment End Date:11/22/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7618-11658. 6842 BBL CROSSLINK GEL,775 BBL LINEAR GEL,74209 BBL SLICKWATER,81826 BBL TOTAL FLUID. 202327# 30/50 OTTAWA/ST. PETERS SAND,1824225# 40/70 OTTAWA/ST. PETERS SAND,2026552# TOTAL SAND.
Total fluid used in treatment (bbls):81826Max pressure during treatment (psi):7670
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):2530Total flowback volume recovered (bbls):8745
Fresh water used in treatment (bbls):79296Disposition method For flowback:RECYCLE
Total proppant used (lbs):2026552Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/29/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 137
BTU_GAS 1264
CALC_BBLS_H2O 1
CALC_BBLS_OIL 137
CALC_GOR 3240
CALC_MCF_GAS 444
CASING_PRESS 1250
GRAVITY_OIL 49
MCF_GAS 444
Perforation Data:
Interval Top:7618 ft.# Of Holes:0
Interval Bottom:11658 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2613
Total Gas Produced (MCF)65652
GOR25125
GOR DeterminationMCFE
Average BOE per Day38.167
Average MCFE per Day221.342

 Federal Financial Assurance  i 

 Tribal Well  i No