|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2024 Measured TD: 11270 ft. Vertical TD: 6514 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/25/2014 | | Proposed Top PZ Location: | Sec:24 Twp: 5N 63W | Footage: 460 FSL 1000 FWL | | Bottom Hole Location: | Sec:24 Twp: 5N 63W | Footage: 460 FNL 1000 FWL | | Proposed Depth/Form: | 11215 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 410 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6870 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 6870 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6770 ft., Depth: 11215 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 9/12/2012 | | Spud Date: | 9/2/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 11270 ft. | Measured PB depth: | 11270 ft. | | True Vertical TD: | 6514 ft. | True Vertical PB depth: | 6514 ft. | | Top PZ Location: | Sec:24 Twp: 5N 63W | Footage: 681 FSL 979 FWL | | Bottom Hole Location: | Sec:24 Twp: 5N 63W | Footage: 494 FNL 961 FWL | | Log Types: | Gamma Ray, CBL | | Log Types: | CBL, Mud. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 434 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 434 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7082 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 745, Top: 1418 ft., Bottom: 7082 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7018 ft., Depth: 11263 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3360 ft. | | | | | SHARON SPRINGS | 6200 ft. | | | | | NIOBRARA | 6369 ft. | | | | | FORT HAYS | 6774 ft. | | | | | CODELL | 6929 ft. | | | | | CARLILE | 7720 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 10/11/2018 Interval Top: 7720 ft. Interval Bottom: 11270 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/11/2018 | Treatment End Date: | N/A | | Treatment Summary: | Producing Intervals: 7720'-8220'; 8780'-8920'; 9120'-9300'; 11200'-11270'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 7720 ft. | # Of Holes: | | | Interval Bottom: | 11270 ft. | Hole Size: | |
|
Formation CD-CRL Formation Classification: OW Status: PR - 1/1/2025 Interval Top: 7175 ft. Interval Bottom: 11270 ft.| Completed Information for Formation CODELL-CARLILE | | 1st Production Date: | 10/9/2012 | Choke Size: | | | Formation Name: | CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/2/2012 | Treatment End Date: | 10/4/2012 | | Treatment Summary: | 18-stage completion using sliding sleeves and casing packers;
60818 total bbls fluid pumped: fresh water (Slickwater);
4214400 total lbs proppant (sand) pumped: 180220 lbs 40/70 Ottawa, 3745780 20/40 Ottawa, and 288400 lbs 20/40 SB. | | Total fluid used in treatment (bbls): | 60818 | Max pressure during treatment (psi): | 5796 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.44 | | Type Of gas: | | Number Of staged intervals: | 18 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 7517 | | Fresh water used in treatment (bbls): | 60818 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4214400 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6796 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/11/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 41 | | BTU_GAS | 1332 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 41 | | CALC_GOR | 1829 | | CALC_MCF_GAS | 75 | | CASING_PRESS | 339 | | GRAVITY_OIL | 43 | | MCF_GAS | 75 | | TUBING_PRESS | 189 |
| | Perforation Data: | | Interval Top: | 7175 ft. | # Of Holes: | | | Interval Bottom: | 11270 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 9/1/2024 Interval Top: 7175 ft. Interval Bottom: 11200 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/11/2018 | Treatment End Date: | N/A | | Treatment Summary: | Producing Intervals: 7175'-7720'; 8220'-8780'; 8920'-9120'; 9300-11200'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7175 ft. | # Of Holes: | | | Interval Bottom: | 11200 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1492 |
| Total Gas Produced (MCF) | 712 |
| GOR | 477 |
| GOR Determination | BOE |
| Average BOE per Day | 4.474 |
| Average MCFE per Day | 25.945 |
| Federal Financial Assurance | i | |
|
|