Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35696
Well Classification: OW Status: SI - 9/1/2024
Well Name/No:PRONGHORN #41-44-18HNB
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2024
FacilityID:429117LocationID:429118
County:WELD #123Location:NENE 18 5N61W 6
Field:WATTENBERG - #90750Elevation:4587 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:200FNL  460 FELLat/Long: 40.408000 / -104.244540Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.407980 / -104.244530Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/1/2013
End Date: 2/1/2013
Reported: 5/7/2013
Days to report: 95
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 9/1/2024             Measured TD: 10711 ft.    Vertical TD: 6086 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/30/2014
Proposed Top PZ Location:Sec:18 Twp: 5N 61W Footage: 757 FNL  512 FEL
Bottom Hole Location:Sec:18 Twp: 5N 61W Footage: 489 FSL  559 FEL
Proposed Depth/Form:10525 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-633 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 128, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6500 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 775, Top: 0 ft., Bottom: 6500 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 10489 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/12/2013
Spud Date:1/7/2013Spud Date Is:ACTUAL
Measured TD:10711 ft.Measured PB depth:10711 ft.
True Vertical TD:6086 ft.True Vertical PB depth:6086 ft.
Top PZ Location:Sec:18 Twp: 5N 61WFootage: 757 FNL  512 FEL
Bottom Hole Location:Sec:18 Twp: 5N 61WFootage: 489 FSL  559 FEL
Log Types:Mud, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 417 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 417 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6569 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 733, Top: 3180 ft., Bottom: 6567 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6478 ft., Depth: 10711 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS5886 ft.
NIOBRARA6052 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 11/1/2024                 Interval Top: 6567 ft.    Interval Bottom: 10711 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/13/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/16/2013Treatment End Date:1/16/2013
Treatment Summary:“18 stage Niobrara pumped a total of 49,310 bbls of fluid (pHaser Frac) and 4,176,595# of sand (40/70 Ottawa, 30/50 Ottawa, 20/40 SB Excel), ATP 3,752 psi, ATR 50.1 bpm, Final ISDP 2,681 psi, completed with sliding sleeves and casing packers.”
Total fluid used in treatment (bbls):49310Max pressure during treatment (psi):5743
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7054
Fresh water used in treatment (bbls):49310Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4176595Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:5781 ft.
Tubing Packer Depth:5837 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/11/2012Test Method:flowing
Hours Tested:72Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 443
BBLS_OIL 154
BTU_GAS 1311
CALC_BBLS_H2O 148
CALC_BBLS_OIL 51
CALC_GOR 84
CALC_MCF_GAS 43
CASING_PRESS 240
GRAVITY_OIL 43
MCF_GAS 130
TUBING_PRESS 250
Perforation Data:
Interval Top:6567 ft.# Of Holes:
Interval Bottom:10711 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
03/06/2026
Defined Inactive (SI )YDefined Inactive
10/31/2024
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No