Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35696
Well Classification: OW Status: SI - 9/1/2024
Well Name/No:PRONGHORN #41-44-18HNB
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2024
FacilityID:429117LocationID:429118
County:WELD #123Location:NENE 18 5N61W 6
Field:WATTENBERG - #90750Elevation:4587 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:200FNL  460 FELLat/Long: 40.408000 / -104.244540Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.407980 / -104.244530Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/1/2013
End Date: 2/1/2013
Reported: 5/7/2013
Days to report: 95
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 9/1/2024             Measured TD: 10711 ft.    Vertical TD: 6086 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/30/2014
Proposed Top PZ Location:Sec:18 Twp: 5N 61W Footage: 757 FNL  512 FEL
Bottom Hole Location:Sec:18 Twp: 5N 61W Footage: 489 FSL  559 FEL
Proposed Depth/Form:10525 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-633 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 128, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6500 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 775, Top: 0 ft., Bottom: 6500 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 10489 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/12/2013
Spud Date:1/7/2013Spud Date Is:ACTUAL
Measured TD:10711 ft.Measured PB depth:10711 ft.
True Vertical TD:6086 ft.True Vertical PB depth:6086 ft.
Top PZ Location:Sec:18 Twp: 5N 61WFootage: 757 FNL  512 FEL
Bottom Hole Location:Sec:18 Twp: 5N 61WFootage: 489 FSL  559 FEL
Log Types:Mud, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 417 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 417 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6569 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 733, Top: 3180 ft., Bottom: 6567 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6478 ft., Depth: 10711 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS5886 ft.
NIOBRARA6052 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 11/1/2024                 Interval Top: 6567 ft.    Interval Bottom: 10711 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/13/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/16/2013Treatment End Date:1/16/2013
Treatment Summary:“18 stage Niobrara pumped a total of 49,310 bbls of fluid (pHaser Frac) and 4,176,595# of sand (40/70 Ottawa, 30/50 Ottawa, 20/40 SB Excel), ATP 3,752 psi, ATR 50.1 bpm, Final ISDP 2,681 psi, completed with sliding sleeves and casing packers.”
Total fluid used in treatment (bbls):49310Max pressure during treatment (psi):5743
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7054
Fresh water used in treatment (bbls):49310Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4176595Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:5781 ft.
Tubing Packer Depth:5837 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/11/2012Test Method:flowing
Hours Tested:72Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 443
BBLS_OIL 154
BTU_GAS 1311
CALC_BBLS_H2O 148
CALC_BBLS_OIL 51
CALC_GOR 84
CALC_MCF_GAS 43
CASING_PRESS 240
GRAVITY_OIL 43
MCF_GAS 130
TUBING_PRESS 250
Perforation Data:
Interval Top:6567 ft.# Of Holes:
Interval Bottom:10711 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10
GOR
GOR DeterminationMCFE
Average BOE per Day0.005
Average MCFE per Day0.027

 Federal Financial Assurance  i 

 Tribal Well  i No