Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35661
Well Classification: GW Status: PR - 2/14/2013
Well Name/No:HAYMAKER #4N-9HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/14/2013
FacilityID:429058LocationID:420156
County:WELD #123Location:SWSW 9 2N65W 6
Field:WATTENBERG - #90750Elevation:4897 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:441FSL  319 FWLLat/Long: 40.147172 / -104.677238Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.147175 / -104.677237Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/28/2013
End Date: 1/28/2013
Reported: 3/20/2013
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/14/2013             Measured TD: 11526 ft.    Vertical TD: 7044 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/14/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/24/2014
Proposed Top PZ Location:Sec:9 Twp: 2N 65W Footage: 940 FSL  618 FWL
Bottom Hole Location:Sec:9 Twp: 2N 65W Footage: 483 FNL  487 FWL
Proposed Depth/Form:12470 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 890 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 890 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7323 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 710, Top: , Bottom: 7323 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6327 ft., Depth: 12470 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/29/2012
Spud Date:10/8/2012Spud Date Is:ACTUAL
Measured TD:11526 ft.Measured PB depth:11463 ft.
True Vertical TD:7044 ft.True Vertical PB depth:7042 ft.
Top PZ Location:Sec:9 Twp: 2N 65WFootage: 940 FSL  618 FWL
Bottom Hole Location:Sec:9 Twp: 2N 65WFootage: 483 FNL  487 FWL
Log Types:PRE FORM 5
Log Types:CBL; LWD: (2) GRR, SGRR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 943 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 943 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7546 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 739, Top: 730 ft., Bottom: 7546 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6230 ft., Depth: 11511 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7006 ft.
NIOBRARA7118 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 2/14/2013                 Interval Top: 7581 ft.    Interval Bottom: 11526 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/9/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/26/2013Treatment End Date:1/28/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7581-11526. 9799 BBL CROSSLINK GEL, 1859 BBL LINEAR GEL, 62382 BBL FR WATER, 74040 BBL TOTAL FLUID. 1525326# 40/70 SAND, 276730# 30/50 SAND, 34504# CRC 20/40 SAND, 1836560# TOTAL SAND.
Total fluid used in treatment (bbls):74040Max pressure during treatment (psi):7616
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5919
Fresh water used in treatment (bbls):62382Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1836560Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6997 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 221
BBLS_OIL 408
BTU_GAS 1247
CALC_BBLS_H2O 221
CALC_BBLS_OIL 408
CALC_GOR 2042
CALC_MCF_GAS 833
CASING_PRESS 2136
GRAVITY_OIL 49
MCF_GAS 833
TUBING_PRESS 1460
Perforation Data:
Interval Top:7581 ft.# Of Holes:0
Interval Bottom:11526 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)569
Total Gas Produced (MCF)13768
GOR24196
GOR DeterminationMCFE
Average BOE per Day8.138
Average MCFE per Day47.221

 Federal Financial Assurance  i 

 Tribal Well  i No