Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35490
Well Classification: GW Status: PR - 8/1/2024
Well Name/No:NILES #3N-28HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:428722LocationID:428725
County:WELD #123Location:SESW 28 3N66W 6
Field:WATTENBERG - #90750Elevation:4959 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:248FSL  2281 FWLLat/Long: 40.189393 / -104.783547Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.189393 / -104.783547Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/12/2013
End Date: 3/12/2013
Reported: 5/14/2013
Days to report: 63
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2024             Measured TD: 11719 ft.    Vertical TD: 7225 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/26/2014
Proposed Top PZ Location:Sec:28 Twp: 3N 66W Footage: 623 FSL  1890 FWL
Bottom Hole Location:Sec:28 Twp: 3N 66W Footage: 460 FNL  1890 FWL
Proposed Depth/Form:11736 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 670, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7540 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: , Bottom: 7540 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6520 ft., Depth: 11736 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/18/2012
Spud Date:10/2/2012Spud Date Is:ACTUAL
Measured TD:11719 ft.Measured PB depth:11694 ft.
True Vertical TD:7225 ft.True Vertical PB depth:7224 ft.
Top PZ Location:Sec:28 Twp: 3N 66WFootage: 690 FSL  1904 FWL
Bottom Hole Location:Sec:28 Twp: 3N 66WFootage: 460 FNL  1890 FWL
Log Types:PRE FORM 5
Log Types:CBL; MWD: (4) SGR, MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 949 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 949 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7616 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 718, Top: 482 ft., Bottom: 7616 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6588 ft., Depth: 11704 ft., Weight: 11.3 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7228 ft.
NIOBRARA7346 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 8/1/2024                  Interval Top: 7915 ft.    Interval Bottom: 11719 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/24/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2013Treatment End Date:3/12/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7915-11719. 20687 BBL CROSSLINK GEL, 1098 BBL LINEAR GEL, 52382 BBL SLICKWATER, 74167 BBL TOTAL FLUID. 1302029# 40/70 SAND, 1184995# 30/50 SAND, 85039 CRC 20/40 SAND, 2572063# TOTAL SAND.
Total fluid used in treatment (bbls):74167Max pressure during treatment (psi):7406
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6886
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2572063Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7125 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 196
BBLS_OIL 382
BTU_GAS 1209
CALC_BBLS_H2O 196
CALC_BBLS_OIL 382
CALC_GOR 2937
CALC_MCF_GAS 1122
CASING_PRESS 2405
GRAVITY_OIL 52
MCF_GAS 1122
TUBING_PRESS 1548
Perforation Data:
Interval Top:7915 ft.# Of Holes:0
Interval Bottom:11719 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2347
Total Gas Produced (MCF)37670
GOR16050
GOR DeterminationMCFE
Average BOE per Day24.198
Average MCFE per Day140.332

 Federal Financial Assurance  i 

 Tribal Well  i No