Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35453
Well Classification: OW Status: PR - 2/7/2013
Well Name/No:PALYO #35N-E11HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/7/2013
FacilityID:428630LocationID:428629
County:WELD #123Location:NWNW 11 2N65W 6
Field:WATTENBERG - #90750Elevation:4850 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:692FNL  851 FWLLat/Long: 40.158583 / -104.637415Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.158582 / -104.637420Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/5/2012
End Date: 12/5/2012
Reported: 1/18/2013
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/7/2013             Measured TD: 11581 ft.    Vertical TD: 6978 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/7/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/19/2014
Proposed Top PZ Location:Sec:11 Twp: 2N 65W Footage: 628 FNL  1434 FWL
Bottom Hole Location:Sec:11 Twp: 2N 65W Footage: 460 FSL  1434 FWL
Proposed Depth/Form:11499 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 630, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7272 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 690, Top: , Bottom: 7272 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6241 ft., Depth: 11499 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/21/2012
Spud Date:7/27/2012Spud Date Is:ACTUAL
Measured TD:11581 ft.Measured PB depth:11557 ft.
True Vertical TD:6978 ft.True Vertical PB depth:6979 ft.
Top PZ Location:Sec:11 Twp: 2N 65WFootage: 652 FNL  1409 FWL
Bottom Hole Location:Sec:11 Twp: 2N 65WFootage: 487 FSL  1432 FWL
Log Types:PRE FORM 5
Log Types:CBL; LWD:SGRR-MD, SGRI-MD, GRR-MD, GRR-TVD; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 883 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 883 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7401 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 500 ft., Bottom: 7401 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6451 ft., Depth: 11566 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7042 ft.
NIOBRARA7157 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/7/2013                  Interval Top: 7450 ft.    Interval Bottom: 11566 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/24/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/4/2012Treatment End Date:12/5/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7450-11566. 778300# 40/70 SAND, 1568060# 30/50 SAND, 113640# SUPER LC, 2460000# TOTAL SAND. 25559 BBL LIGHTNING 24, 461 BBL LINEAR GEL, 25099 BBL SLICKWATER, 51118 BBL TOTAL FLUID.
Total fluid used in treatment (bbls):51118Max pressure during treatment (psi):6450
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):9297
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2460000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7011 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/14/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 296
BTU_GAS 1278
CALC_BBLS_OIL 296
CALC_GOR 1976
CALC_MCF_GAS 585
CASING_PRESS 2098
GRAVITY_OIL 46
MCF_GAS 585
TUBING_PRESS 1302
Perforation Data:
Interval Top:7450 ft.# Of Holes:0
Interval Bottom:11566 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1267
Total Gas Produced (MCF)18660
GOR14727
GOR DeterminationBOE
Average BOE per Day12.309
Average MCFE per Day71.396

 Federal Financial Assurance  i 

 Tribal Well  i No