Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35366
Well Classification: OW Status: PR - 4/26/2019
Well Name/No:DAVIS #1C-9H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/26/2019
FacilityID:428455LocationID:428454
County:WELD #123Location:SWNE 9 2N66W 6
Field:WATTENBERG - #90750Elevation:4915 ft.
Planned Location:2326FNL  1622 FELLat/Long: 40.153440 / -104.778590Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.153535 / -104.778571Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/21/2012
End Date: 7/21/2012
Reported: 10/1/2012
Days to report: 72
Disclosure: Sidetrack #00
Start Date: 10/21/2018
End Date: 10/22/2018
Reported: 6/13/2019
Originally Reported: 3/20/2019
Days to report: 234
Days to report: 149
Disclosure: Sidetrack #00
Start Date: 10/21/2018
End Date: 10/22/2018
Reported: 3/20/2019
Days to report: 149
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/26/2019             Measured TD: 14495 ft.    Vertical TD: 7186 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/26/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/4/2014
Proposed Top PZ Location:Sec:9 Twp: 2N 66W Footage: 1982 FNL  2461 FEL
Bottom Hole Location:Sec:4 Twp: 2N 66W Footage: 615 FNL  2446 FEL
Proposed Depth/Form:14464 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7589 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 928, Top: 500 ft., Bottom: 7589 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14482 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: 1ST LINER, Hole Size: 3.92 in., Size: 3.74 in., Top: 7320 ft., Depth: 13750 ft., Weight: 8.8 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/6/2012
Spud Date:4/10/2012Spud Date Is:ACTUAL
Measured TD:14495 ft.Measured PB depth:14316 ft.
True Vertical TD:7186 ft.True Vertical PB depth:7156 ft.
Top PZ Location:Sec:9 Twp: 2N 66WFootage: 1982 FNL  2461 FEL
Bottom Hole Location:Sec:4 Twp: 2N 66WFootage: 615 N  2446 E
Log Types:Isolation Scanner Cement Evaluation Log/ GeoLogPlot
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 972 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 985 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7637 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 2900 ft., Bottom: 7655 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14482 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 5782 ft., Bottom: 14495 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4410 ft.
NIOBRARA7160 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/26/2019                 Interval Top: 7654 ft.    Interval Bottom: 14315 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/14/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/21/2018Treatment End Date:10/22/2018
Treatment Summary:No additional stages perf'ed. Treated with 62,828 bbl fresh water, 76 bbl HCl, 61 bbl additives (FRP-4CS, ACI-97 and ASF-67) with 1,594,285 proppant.
Total fluid used in treatment (bbls):62965Max pressure during treatment (psi):9127
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):76Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):617
Fresh water used in treatment (bbls):62889Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1594285Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/10/2012Treatment End Date:8/21/2012
Treatment Summary:FRAC STAGE 1. with 1,392 bbls Hybrid fluid system placing 500 lbs proppant. Frac stage 2. Pumped 1531 bbls. slick water and 445 bbls. X-link gel with 17,376# 40/70 sand, sand, total 17,376#). Set frac plug #1 @ 13,984'. Frac stage 3. Pumped 1,487 bbls. slick water and 2,761bbls. X-link gel with 18,215# 40/70 sand, 221,14# 30/50 sand, and 24,224# 20/40 sand,total 263,586#).Set CFP 2 at 13,749’. Frac stage 4. Pumped 1,472 bbls. slick water and 2,746 bbls. X-link gel with 17,501# 40/70 sand, 222,047# 30/50 sand, and 12,873# 20/40 sand, total 252,420#).5# 40/70 sand. Set frac plug #3 @ 13,749'.Set CFP 4 at 13,517’. Frac stage 5. Pumped 1,455 bbls. slick water and 2,750 bbls. X-link gel with 18,515# 40/70 sand, 222,230# 30/50 sand, and 20,104# 20/40 sand, total 260849#). Set CFP 5 at 13,285’. Frac stage 6. Pumped 1,432 bbls. slick water and 2,720 bbls. X-link gel with 18,070# 40/70 sand, 219,000# 30/50 sand, and 12,841# 20/40 sand, total 249,910#. Set CFP 6 at 13,052’. Frac stage 7. Pumped 1,420 bbls. slick water and 2,732 bbls. X-link gel with 17,861# 40/70 sand, 220,188# 30/50 sand, and 12,840# 20/40 sand, total 250,889#. Set CFP 7 at 12,821’. Frac stage 8. Pumped 1,386 bbls. slick water and 2,749 bbls. X-link gel with 17,296# 40/70 sand, 221,159# 30/50 sand, and 12,840# 20/40 sand, total 251,295#. Frac stage 9. Pumped 1,495 bbls. slick water and 2,706 bbls. X-link gel with 17,387# 40/70 sand, 219,703# 30/50 sand, and 12,840# 20/40 sand, total 249,930#. Set CFP 8 at 12,821’. Set CFP 9 at 12,357’. Frac stage 10. Pumped 1,402 bbls. slick water and 2,742 bbls. X-link gel with 17,771# 40/70 sand, 223,866# 30/50 sand, and 12,846# 20/40 sand, total 254,482#. Set CFP 10 at 12,124’. Frac stage 11. Pumped 1,404 bbls. slick water and 2,690 bbls. X-link gel with 17,742# 40/70 sand, 219,878# 30/50 sand, and 12,847# 20/40 sand, total 250,467#. Set CFP 11 at 11,888’. Frac stage 12. Pumped 1,392 bbls. slick water and 2,745 bbls. X-link gel with 17,426# 40/70 sand, 222563# 30/50 sand, and 12,850# 20/40 sand, total 252838#. Set CFP 12 at 11,654’. Frac stage 13. Pumped 1,382 bbls. slick water and 2,700 bbls. X-link gel with 17,737# 40/70 sand, 219,287# 30/50 sand, and 12,879# 20/40 sand, total 249,903#. Set CFP 13 at 11,418’. Frac stage 14. Pumped 1,376 bbls. slick water and 2,730 bbls. X-link gel with 17,472# 40/70 sand, 221,313# 30/50 sand, and 12,909# 20/40 sand, total 251,694#. Set CFP 14 at 11,183’. Frac stage 15. Pumped 1,372 bbls. slick water and 2,752 bbls. X-link gel with 17,480# 40/70 sand, 222,587# 30/50 sand, and 12,838# 20/40 sand, total 252,904#. Set CFP 15 at 10,946’. Frac stage 16. Pumped 1,360 bbls. slick water and 2,733 bbls. X-link gel with 17,273# 40/70 sand, 221,618# 30/50 sand, and 12,840# 20/40 sand, total 251,7314#. Set CFP 16 at 10,701’. Frac stage 17. Pumped 1367 bbls. slick water and 2,734 bbls. X-link gel with 17,492# 40/70 sand, 222003# 30/50 sand, and 12,888# 20/40 sand, total 252383#. Set CFP 17 at 10,451’. Frac stage 18. Pumped 1149 bbls. slick water and 2,756 bbls. X-link gel with 17,310# 40/70 sand, 221,654# 30/50 sand, and 12,794# 20/40 sand, total 251,758#. Set frac plug #18 @ 10,201', Frac stage 19. Pumped 1348 bbls. slick water and 2,709 bbls. X-link gel with 17,292# 40/70 sand, 219,923# 30/50 sand, and 12840# 20/40 sand, total 250055#. Set CFP 19 at 9,921’. Frac stage 20. Pumped 1,353 bbls. slick water and 2,700 bbls. X-link gel with 17,302# 40/70 sand, 220,143# 30/50 sand, and 12,840# 20/40 sand, total 250,285#. Set CFP 20 at 9,713’. Frac stage 21. Pumped 1,337 bbls. slick water and 2,721 bbls. X-link gel with 17,334# 40/70 sand, 218,511# 30/50 sand, and 12,804# 20/40 sand, total 248,649#. Set CFP 21 at 9,65’. Frac stage 22. Pumped 1341 bbls. slick water and 2716 bbls. X-link gel with 17,384# 40/70 sand, 220153# 30/50 sand, and 12,840# 20/40 sand, total 250378#. Set CFP 22 at 9,215’. Frac stage 23. Pumped 1,334 bbls. slick water and 2,710 bbls. X-link gel with 17,343# 40/70 sand, 220,364# 30/50 sand, and 12,840# 20/40 sand, total 250547#. Set CFP 23 at 8,966’. Frac stage 24. Pumped 1,789 bbls. slick water and 0 bbls. X-link gel with 6,612# 40/70 sand, total 6,612#. Set CFP 24 at 8,716’. Frac stage 25. Pumped 776 bbls. slick water and 259 bbls. linear gel with 4,526# 40/70 sand. Set frac plug #25 @ 8,466', Frac stage 26. Pumped 1,932 bbls. slick water and 3,260 bbls. X-link gel with 27,071# 40/70 sand, 263,744# 30/50 sand, and 15,393# 20/40 sand, total 306,209#. Set frac plug #26 @ 8,179', Frac stage 27. Pumped 1,551 bbls. slick water and 3,479 bbls. X-link gel with 20,754# 40/70 sand, 256,669# 30/50 sand, and 20,136# 20/40 sand, total 297,559#. Set frac plug #27 @ 7,886', Frac stage 28. Pumped 1,051 bbls. slick water and 3,329 bbls. X-link gel with 22,969# 40/70 sand, 264,045# 30/50 sand, and 22,580# 20/40 sand, total 309,594#. Set CBP @ 6420'. Drilled kill plug and drill plugs.
Total fluid used in treatment (bbls):115269Max pressure during treatment (psi):8460
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):115269Total flowback volume recovered (bbls):8627
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7329 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/4/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 256
BBLS_OIL 396
BTU_GAS 1319
CALC_BBLS_H2O 256
CALC_BBLS_OIL 396
CALC_GOR 3194
CALC_MCF_GAS 1265
CASING_PRESS 1950
GRAVITY_OIL 49
MCF_GAS 1265
TUBING_PRESS 1150
Perforation Data:
Interval Top:7654 ft.# Of Holes:1440
Interval Bottom:14315 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2214
Total Gas Produced (MCF)62726
GOR28331
GOR DeterminationMCFE
Average BOE per Day35.611
Average MCFE per Day206.523

 Federal Financial Assurance  i 

 Tribal Well  i No