|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 10/7/2019 Measured TD: 6929 ft. Vertical TD: 6658 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 10/7/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/7/2014 | Proposed Top PZ Location: | Sec:29 Twp: 5N 62W | Footage: 2659 FSL 2567 FWL | Bottom Hole Location: | Sec:29 Twp: 5N 62W | Footage: 2659 FSL 2567 FWL | Proposed Depth/Form: | 6905 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 410 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 170, Top: 0 ft., Bottom: 410 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6875 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 159, Top: 6025 ft., Bottom: 6905 ft. |
| | |
Wellbore Completed | Completion Date: | 4/12/2012 | Spud Date: | 4/7/2012 | Spud Date Is: | ACTUAL | Measured TD: | 6929 ft. | Measured PB depth: | 6897 ft. | True Vertical TD: | 6658 ft. | True Vertical PB depth: | 6626 ft. | Top PZ Location: | Sec:29 Twp: 5N 62W | Footage: 2659 FSL 2567 FWL | Bottom Hole Location: | Sec:29 Twp: 5N 62W | Footage: 2659 S 2567 W | Log Types: | CBL, GAMMA RAY, HRI, CDL, CNL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 475 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 340, Top: 0 ft., Bottom: 475 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6897 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 445, Top: 2760 ft., Bottom: 6929 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SHARON SPRINGS | 6089 ft. | | | | NIOBRARA | 6210 ft. | | | | FORT HAYS | 6447 ft. | | | | CODELL | 6472 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/7/2019 Interval Top: 6746 ft. Interval Bottom: 6754 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/14/2012 | Treatment Summary: | CODELL PUMPED 32,760 GALS PAD FLUID. PUMPED 113,148 GALS OF SLF. PUMPED 246,500 LBS OF 20/40 OTTAWA SAND (1-4 PPG). FINAL ISDP= 2871 PSI. AVE. PRESS=3397 PSI. AVE. RATE=22.5 BPM. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 6746 ft. | # Of Holes: | 32 | Interval Bottom: | 6754 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: TA - 10/7/2019 Interval Top: 6438 ft. Interval Bottom: 6754 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 32 | BTU_GAS | 1284 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 32 | CALC_GOR | 699 | CALC_MCF_GAS | 22 | CASING_PRESS | 542 | GRAVITY_OIL | 41 | MCF_GAS | 22 | TUBING_PRESS | 430 |
| Perforation Data: | Interval Top: | 6438 ft. | # Of Holes: | 80 | Interval Bottom: | 6754 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/7/2019 Interval Top: 6438 ft. Interval Bottom: 6640 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/14/2012 | Treatment Summary: | NIOBRARA PUMPED 19,488 GALS OF PAD FLUID. PUMPED 118,692 GALS OF SLF. PUMPED 260,020 LBS OF 30/50 OTTAWA SAND (1-4 PPG). FINAL ISDP= 2927 PSI. AVE. PRESS.= 3672 PSI. AVE. RATE= 50.7 BPM. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6438 ft. | # Of Holes: | 48 | Interval Bottom: | 6640 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 09/30/2019 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|