|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/9/2022 Measured TD: 6795 ft. Vertical TD: 6675 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/9/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/7/2014 | Proposed Top PZ Location: | Sec:29 Twp: 5n 62w | Footage: 1245 FSL 2562 FWL | Bottom Hole Location: | Sec:29 Twp: 5n 62w | Footage: 1245 FSL 2562 FWL | Proposed Depth/Form: | 6755 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 410 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 170, Top: 0 ft., Bottom: 410 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6725 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 159, Top: 5875 ft., Bottom: 6755 ft. |
| | |
Wellbore Completed | Completion Date: | 4/18/2012 | Spud Date: | 4/14/2012 | Spud Date Is: | ACTUAL | Measured TD: | 6795 ft. | Measured PB depth: | 6763 ft. | True Vertical TD: | 6675 ft. | True Vertical PB depth: | 6643 ft. | Top PZ Location: | Sec:29 Twp: 5n 62w | Footage: 1245 FSL 2562 FWL | Bottom Hole Location: | Sec:29 Twp: 5n 62w | Footage: 1245 S 2562 W | Log Types: | CBL, GAMMA RAY, HRI, CDL, CNL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 475 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 340, Top: 0 ft., Bottom: 475 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6763 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 465, Top: 2460 ft., Bottom: 6795 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SHARON SPRINGS | 6224 ft. | | | | NIOBRARA | 6329 ft. | | | | CODELL | 6593 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/7/2019 Interval Top: 6593 ft. Interval Bottom: 6601 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/17/2012 | Treatment Summary: | Pumped 3223 bbls of fluid with 245740 lbs 20/40 sand. ATP 3549. ATR 22.4. ISDP 2904
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 6593 ft. | # Of Holes: | 32 | Interval Bottom: | 6601 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/9/2022 Interval Top: 6336 ft. Interval Bottom: 6601 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 28 | BBLS_OIL | 119 | BTU_GAS | 1311 | CALC_BBLS_H2O | 9 | CALC_BBLS_OIL | 40 | CALC_GOR | 1261 | CALC_MCF_GAS | 50 | CASING_PRESS | 993 | GRAVITY_OIL | 43 | MCF_GAS | 150 | TUBING_PRESS | 593 |
| Perforation Data: | Interval Top: | 6336 ft. | # Of Holes: | 80 | Interval Bottom: | 6601 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/7/2019 Interval Top: 6336 ft. Interval Bottom: 6490 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/17/2012 | Treatment Summary: | Pumped 3397 bbls of fluid with 260760 lbs 20/40 sand. ATP 3610. ATR 49.4. ISDP 3000
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6336 ft. | # Of Holes: | 48 | Interval Bottom: | 6490 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | Y | 02/09/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|