Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35228
Well Classification: GW Status: SI - 7/1/2022
Well Name/No:MELBON RANCH #3B-17H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2022
FacilityID:428104LocationID:428103
County:WELD #123Location:SWSW 17 2N65W 6
Field:WATTENBERG - #90750Elevation:4958 ft.
Planned Location:1310FSL  210 FWLLat/Long: 40.134980 / -104.696630Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.134988 / -104.696649Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/16/2012
End Date: 6/16/2012
Reported: 9/6/2012
Days to report: 82
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2022             Measured TD: 11980 ft.    Vertical TD: 7145 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/7/2014
Proposed Top PZ Location:Sec:17 Twp: 2N 65W Footage: 1755 FSL  543 FWL
Bottom Hole Location:Sec:17 Twp: 2N 65W Footage: 1730 FSL  460 FEL
Proposed Depth/Form:11838 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 880 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 880 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7538 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 922, Top: 500 ft., Bottom: 7538 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11838 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/1/2012
Spud Date:3/14/2012Spud Date Is:ACTUAL
Measured TD:11980 ft.Measured PB depth:11959 ft.
True Vertical TD:7145 ft.True Vertical PB depth:7145 ft.
Top PZ Location:Sec:17 Twp: 2N 65WFootage: 1742 FSL  510 FWL
Bottom Hole Location:Sec:17 Twp: 2N 65WFootage: 1765 S  602 W
Log Types:No logs ran.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 926 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 926 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7522 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 625, Top: 0 ft., Bottom: 7510 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11980 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7073 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  SI - 7/1/2022                  Interval Top: 7586 ft.    Interval Bottom: 11788 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/4/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/11/2012Treatment End Date:6/16/2012
Treatment Summary:Frac stage 1. Pumped 1381 bbls. slick water and 2707bbls. X-link gel with 17,392# 40/70 sand, 220,378# 30/50 sand, and 12,840# 20/40 sand total 250,610#). Set CFP 1 at 11,644’. Frac stage 2. Pumped 1381 bbls. slick water and 2679 bbls. X-link gel with 17,394# 40/70 sand, 219,721# 30/50 sand, and 12,840# 20/40 sand, total 249,955#). Set CFP 2 at 11,403’. Frac stage 3. Pumped 1384 bbls. slick water and 2707 bbls. X-link gel with 17,216# 40/70 sand, 220,776# 30/50 sand, and 17,132# 20/40 sand, total 255,124#). Set CFP 3 at 11,165’. Frac stage 4. Pumped 1363 bbls. slick water and 2703 bbls. X-link gel with 17,311# 40/70 sand, 219,687# 30/50 sand, and 12,974# 20/40 sand, total 249,972#). Set CFP 4 at 10,921’. Frac stage 5. Pumped 1365 bbls. slick water and 2706 bbls. X-link gel with 17,472# 40/70 sand, 220,817# 30/50 sand, and 12,840# 20/40 sand, total 251,129#). Set CFP 5 at 10,680’. Frac stage 6. Pumped 1487 bbls. Slick water and 2715 bbls. X-link gel with 17,474# 40/70 sand, 219,611# 30/50 sand, and 19,824# 20/40 sand, total 256,876#). Set CFP 6 at 10,445’. Frac stage 7. Pumped 1367 bbls. slick water and 2745 bbls. X-link gel with 17,848# 40/70 sand, 221,731# 30/50 sand, and 21,596# 20/40 sand, total 261,175#). Set CFP 7 @ 10213’. Frac stage 8. Pumped 1357 bbls. slick water and 2735 bbls. X-link gel with 17,429# 40/70 sand, 223,303# 30/50 sand, and 12,840# 20/40 sand, total 253,572#). Set CFP 8 at 9,979’. Frac stage 9. Pumped 1348 bbls. slick water and 2695 bbls. X-link gel with 17,417# 40/70 sand, 219,586# 30/50 sand, and 12,840# 20/40 sand, total 249,843#). Set CFP 9 at 9,741’. Frac stage 10. . Pumped 1359 bbls. slick water and 2791 bbls. X-link gel with 17,720# 40/70 sand, 224,433# 30/50 sand, and 12,840# 20/40 sand, total 254,993#). Set CFP 10 at 9,498’.Frac stage 11. Pumped 1561 bbls. slick water and 3360 bbls. X-link gel with 20,654# 40/70 sand, 263,960# 30/50 sand, and 15,400# 20/40 sand, total 300,014#). Set CFP 11 at 9,220’. Frac stage 12. Pumped 1565 bbls. slick water and 3220 bbls. X-link gel with 20,718# 40/70 sand, 264,012# 30/50 sand, and 16,660# 40/70 sand, total 301,389#). Set CFP 15 at 8,107’. Frac stage 16. Pumped 1552 bbls. slick water and 3351 bbls. X-link gel with 20,918# 40/70 sand, 275,708# 30/50 sand, and 25,548# 20/40 sand, total 322,174#). Set CFP 16 at 7,827’. Frac stage 17. Pumped 1508 bbls. slick water and 3363 bbls. X-link gel with 20,822# 40/70 sand, 273,167# 30/50 sand, and 17,068# 20/40 sand, total 311,057#). Set CBP 6580’. Drill kill plug at 8580', CFP's at 7827', 8107', 8390', 8671', 8949', 9220', 9498', 10445', 10680', 10921', 11165', 11403', 11644'.
Total fluid used in treatment (bbls):77108Max pressure during treatment (psi):7118
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):77108Total flowback volume recovered (bbls):4687
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4655722Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 430
BBLS_OIL 243
BTU_GAS 1386
CALC_BBLS_H2O 430
CALC_BBLS_OIL 243
CALC_GOR 1909
CALC_MCF_GAS 464
CASING_PRESS 2550
GRAVITY_OIL 49
MCF_GAS 464
TUBING_PRESS 1850
Perforation Data:
Interval Top:7586 ft.# Of Holes:897
Interval Bottom:11788 ft.Hole Size:0.375 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
06/30/2022
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No