|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 6/25/2012 Measured TD: 8075 ft. Vertical TD: 7508 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/25/2012 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/24/2014 | | Proposed Top PZ Location: | Sec:35 Twp: 3N 66W | Footage: 725 FSL 556 FWL | | Bottom Hole Location: | Sec:35 Twp: 3N 66W | Footage: 982 FSL 600 FWL | | Proposed Depth/Form: | 12944 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: 35:W2W2; 26:SW4SW4 | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 770 ft., Weight: 36.0 , Citings Type: PLANNED | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 770 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7835 ft., Weight: 26.0 , Citings Type: PLANNED | | Cement: | Sacks: 790, Top: , Bottom: 7835 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6770 ft., Depth: 12944 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/11/2012 | | Spud Date: | 3/27/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8075 ft. | Measured PB depth: | 7695 ft. | | True Vertical TD: | 7508 ft. | True Vertical PB depth: | 7444 ft. | | Bottom Hole Location: | Sec:35 Twp: 3N 66W | Footage: 982 FSL 600 FWL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 806 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 574, Top: 0 ft., Bottom: 806 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.875 in., Size: 7 in., Top: 0 ft., Depth: 7797 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 739, Top: 1004 ft., Bottom: 7797 ft., Determination Method: CBL | | Casing: | String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 7797 ft., Depth: 8075 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST , Top: 7695 ft., Depth: 8075 ft., Bottom: 8075 ft., Sacks: 74, Method: | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 6/1/2019 Measured TD: 12848 ft. Vertical TD: 7465 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 6/1/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/29/2014 | | Proposed Top PZ Location: | Sec:35 Twp: 3N 66W | Footage: 737 FSL 561 FWL | | Bottom Hole Location: | Sec:26 Twp: 3N 66W | Footage: 452 FSL 551 FWL | | Proposed Depth/Form: | 12848 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 806 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 574, Top: 22 ft., Bottom: 806 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7797 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 739, Top: 7695 ft., Bottom: 7797 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6884 ft., Depth: 12834 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/21/2012 | | Spud Date: | 3/26/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 12848 ft. | Measured PB depth: | 12824 ft. | | True Vertical TD: | 7465 ft. | True Vertical PB depth: | 7465 ft. | | Top PZ Location: | Sec:35 Twp: 3N 66W | Footage: 737 FSL 561 FWL | | Bottom Hole Location: | Sec:26 Twp: 3N 66W | Footage: 452 FSL 551 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | CBL; MD LOG; ADR-PCG-CTN-ALD-PCD; MD-LOG; CTN-ALD-ADR-PCG-PDC | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 806 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 574, Top: 0 ft., Bottom: 806 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7797 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 739, Top: 1004 ft., Bottom: 7797 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6884 ft., Depth: 12834 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7305 ft. | | | | | NIOBRARA | 7422 ft. | | | | | CODELL | 7753 ft. | | | |
Formation CODL Formation Classification: OW Status: PR - 6/1/2019 Interval Top: 7888 ft. Interval Bottom: 12765 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/2/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/23/2012 | Treatment End Date: | 7/24/2012 | | Treatment Summary: | TREATED THROUGH AN OPEN HOLE LINER FROM 7888-12765. AVERAGE TREATING PRESSURE 5185, AVERAGE RATE 55.5.
1300020# 40/70, 2661550# 30/50, 203520# CRC-20/40, TOTAL SAND WEIGHT 4165090# | | Total fluid used in treatment (bbls): | 90747 | Max pressure during treatment (psi): | 7752 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 24 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.92 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 8440 | | Fresh water used in treatment (bbls): | 39399 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4165090 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7396 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/13/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 322 | | BTU_GAS | 1279 | | CALC_BBLS_OIL | 322 | | CALC_GOR | 1703 | | CALC_MCF_GAS | 548 | | CASING_PRESS | 2468 | | GRAVITY_OIL | 56 | | MCF_GAS | 548 | | TUBING_PRESS | 1405 |
| | Perforation Data: | | Interval Top: | 7888 ft. | # Of Holes: | 0 | | Interval Bottom: | 12765 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3431 |
| Total Gas Produced (MCF) | 40502 |
| GOR | 11804 |
| GOR Determination | BOE |
| Average BOE per Day | 28.452 |
| Average MCFE per Day | 165.030 |
| Federal Financial Assurance | i | |
|
|