|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/6/2012 Measured TD: 10749 ft. Vertical TD: 7237 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/6/2012 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/16/2014 | | Proposed Top PZ Location: | Sec:29 Twp: 3N 65W | Footage: 869 FSL 1042 FEL | | Bottom Hole Location: | Sec:29 Twp: 3N 65W | Footage: 1393 FNL 1055 FEL | | Proposed Depth/Form: | 11773 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36.0 , Citings Type: PLANNED | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7574 ft., Weight: 26.0 , Citings Type: PLANNED | | Cement: | Sacks: 740, Top: , Bottom: 7574 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6530 ft., Depth: 11773 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 6/29/2012 | | Spud Date: | 4/12/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 10749 ft. | Measured PB depth: | 8130 ft. | | True Vertical TD: | 7237 ft. | True Vertical PB depth: | 7222 ft. | | Bottom Hole Location: | Sec:29 Twp: 3N 65W | Footage: 1393 FNL 1055 FEL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 913 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 0 ft., Bottom: 913 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7710 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 792, Top: 650 ft., Bottom: 7710 ft., Determination Method: CALC | | Casing: | String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 7710 ft., Depth: 10749 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | No formation data to display. |
Sidetrack #01 Wellbore Classification: GW Status: PR - 2/1/2018 Measured TD: 11650 ft. Vertical TD: 7195 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: GW PR - 2/1/2018 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/17/2014 | | Proposed Top PZ Location: | Sec:29 Twp: 3N 65W | Footage: 871 FSL 1040 FEL | | Bottom Hole Location: | Sec:29 Twp: 3N 65W | Footage: 460 FNL 1105 FEL | | Proposed Depth/Form: | 11671 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7710 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 760, Top: , Bottom: 7710 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6530 ft., Depth: 11671 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 7/12/2012 | | Spud Date: | 4/12/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 11650 ft. | Measured PB depth: | 11635 ft. | | True Vertical TD: | 7195 ft. | True Vertical PB depth: | 7195 ft. | | Top PZ Location: | Sec:29 Twp: 3N 65W | Footage: 869 FSL 1042 FEL | | Bottom Hole Location: | Sec:29 Twp: 3N 65W | Footage: 481 FNL 1055 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CBL; PCG-ADR-PCDC; MUD LOG | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 913 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 0 ft., Bottom: 913 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7710 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 792, Top: 430 ft., Bottom: 7710 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6389 ft., Depth: 11635 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 6911 ft. | | | | | NIOBRARA | 6989 ft. | | | | | FORT HAYS | 7479 ft. | | | | | CODELL | 7588 ft. | | | |
Formation CODL Formation Classification: GW Status: PR - 2/1/2018 Interval Top: 7742 ft. Interval Bottom: 11635 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/15/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/24/2012 | Treatment End Date: | 9/25/2012 | | Treatment Summary: | FRAC'D THROUGH AN OPEN HOLE LINER FROM 7742-11635.
1491560# 40/70, 301580# 30/50, 23820# CRC20/40, 1816960# TOTAL.
Remainder of fluids: 10273 bbls of PerStim, 106 bbls of Liner Gel, and 1246 of PerStim Pad. | | Total fluid used in treatment (bbls): | 71260 | Max pressure during treatment (psi): | 6629 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 19 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 3988 | | Fresh water used in treatment (bbls): | 60881 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 1816960 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7101 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/23/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 182 | | BTU_GAS | 1225 | | CALC_BBLS_OIL | 182 | | CALC_GOR | 5665 | | CALC_MCF_GAS | 1031 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 53 | | MCF_GAS | 1031 | | TUBING_PRESS | 124 |
| | Perforation Data: | | Interval Top: | 7742 ft. | # Of Holes: | 0 | | Interval Bottom: | 11635 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1924 |
| Total Gas Produced (MCF) | 51902 |
| GOR | 26976 |
| GOR Determination | MCFE |
| Average BOE per Day | 29.733 |
| Average MCFE per Day | 172.446 |
| Federal Financial Assurance | i | |
|
|