|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/14/2024 Measured TD: 8580 ft. Vertical TD: 8240 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/14/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/30/2014 | | Proposed Top PZ Location: | Sec:29 Twp: 2N 67W | Footage: 677 FSL 667 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 677 FSL 667 FWL | | Proposed Depth/Form: | 8561 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24.0 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8561 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8561 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/21/2012 | | Spud Date: | 4/14/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8580 ft. | Measured PB depth: | 4100 ft. | | True Vertical TD: | 8240 ft. | True Vertical PB depth: | 3901 ft. | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 677 FSL 667 FWL | | Log Types: | TRIPLE COMBO OPEN HOLE LOGS RUN BY PSI 4/19/12, WILL PROVIDE LOGS WITH SIDETRACK WHEN THE LOGS ARE RECEIVED. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 880 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 5300 ft., Depth: 8584 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 44, Top: 8310 ft., Bottom: 8584 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8292 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1027, Top: 1140 ft., Bottom: 8296 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4113 ft., Depth: 4613 ft., Bottom: 4613 ft., Sacks: 212, Method: | | Additional Cement: | String Type: 1ST , Top: 4800 ft., Depth: 5300 ft., Bottom: 5300 ft., Sacks: 142, Method: | | No formation data to display. |
Sidetrack #01 Wellbore Classification: GW Status: AB - 2/14/2024 Measured TD: 8580 ft. Vertical TD: 8240 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: GW AB - 2/14/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/2/2014 | | Proposed Top PZ Location: | Sec:29 Twp: 2N 67W | Footage: 659 FSL 610 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 659 FSL 610 FWL | | Proposed Depth/Form: | 8596 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 890 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 890 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8596 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8596 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/30/2012 | | Spud Date: | 4/14/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8580 ft. | Measured PB depth: | 8534 ft. | | True Vertical TD: | 8240 ft. | True Vertical PB depth: | 8194 ft. | | Top PZ Location: | Sec:29 Twp: 2N 67W | Footage: 693 FSL 594 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 699 FSL 605 FWL | | Log Types: | PRE FORM 5 | | Log Types: | CBL; NO OPEN HOLE LOGS | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 880 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8580 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 44, Top: 8295 ft., Bottom: 8580 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8295 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1030, Top: 1140 ft., Bottom: 8295 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4326 ft. | | | | | SUSSEX | 4751 ft. | | | | | SHANNON | 5369 ft. | | | | | NIOBRARA | 7700 ft. | | | | | CODELL | 8008 ft. | | | | | J SAND | 8456 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 11/27/2012 Interval Top: 7998 ft. Interval Bottom: 8018 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/7/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/16/2012 | Treatment End Date: | 7/16/2012 | | Treatment Summary: | PERF CODL 7998-8018 HOLES 60 SIZE .38
Frac CODL down 4.5" casing w/ 200,017 gal slickwater w/ 150,040# 40/70, 4,000# 20/40.
Broke @ 3,935 psi @ 4.9 bpm. ATP=4,408 psi; MTP=4,952 psi; ATR=61.2 bpm; ISDP=2,712 psi | | Total fluid used in treatment (bbls): | 4762 | Max pressure during treatment (psi): | 4952 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154040 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7998 ft. | # Of Holes: | 60 | | Interval Bottom: | 8018 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/14/2024 Interval Top: 7766 ft. Interval Bottom: 8018 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/7/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/7/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 30 | | BTU_GAS | 1229 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 3233 | | CALC_MCF_GAS | 97 | | CASING_PRESS | 1332 | | GRAVITY_OIL | 47 | | MCF_GAS | 97 |
| | Perforation Data: | | Interval Top: | 7766 ft. | # Of Holes: | 120 | | Interval Bottom: | 8018 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/27/2012 Interval Top: 7766 ft. Interval Bottom: 7866 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/7/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/16/2012 | Treatment End Date: | 7/16/2012 | | Treatment Summary: | PERF NBRR 7766-7866 HOLE 60 SIZE .42
Frac NBRR down 4.5" casing w/ 250 gal 15% HCl & 243,222 gal slickwater w/ 200,560# 40/70, 4,000# 20/40.
Broke @ 3,562 psi @ 5.1 bpm. ATP=4,279 psi; MTP=5,141 psi; ATR=61.3 bpm; ISDP=2,833 psi
| | Total fluid used in treatment (bbls): | 5791 | Max pressure during treatment (psi): | 5141 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 5 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204560 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7766 ft. | # Of Holes: | 60 | | Interval Bottom: | 7866 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/14/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|