Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34942
Well Classification: GW Status: PA - 11/7/2022
Well Name/No:BEARDEN #2-4-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/7/2022
FacilityID:427320LocationID:336188
Municipality/County:ERIE / WELD #123Location:NESW 6 1N68W 6
Field:WATTENBERG - #90750Elevation:4978 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1418FSL  1579 FWLLat/Long: 40.076900 / -105.049800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.076903 / -105.049804Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2013
End Date: 4/21/2013
Reported: 6/27/2013
Days to report: 67
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/4/2022             Measured TD: 8414 ft.    Vertical TD: 8245 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/4/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/14/2014
Proposed Top PZ Location:Sec:6 Twp: 1N 68W Footage: 2595 FSL  1200 FWL
Bottom Hole Location:Sec:6 Twp: 1N 68W Footage: 2595 FSL  1200 FWL
Proposed Depth/Form:8368 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 725 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 265, Top: 0 ft., Bottom: 725 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8368 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 7253 ft., Bottom: 8368 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5338 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 150, Top: 4244 ft., Bottom: 5338 ft.

Wellbore Completed
Completion Date:2/26/2013
Spud Date:2/21/2013Spud Date Is:ACTUAL
Measured TD:8414 ft.Measured PB depth:8365 ft.
True Vertical TD:8245 ft.True Vertical PB depth:8196 ft.
Top PZ Location:Sec:6 Twp: 1N 68WFootage: 2630 FSL  1165 FWL
Bottom Hole Location:Sec:6 Twp: 1N 68WFootage: 2647 FSL  1165 FWL
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 754 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 754 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8402 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 8414 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4494 ft.
NIOBRARA7484 ft.
CODELL7827 ft.
J SAND8254 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 11/7/2022                 Interval Top: 8257 ft.    Interval Bottom: 8290 ft.

 Completed Information for Formation J SAND
1st Production Date:5/9/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/19/2013Treatment End Date:4/19/2013
Treatment Summary:Frac'd the J Sand with 109,559# 40/70 with 110,670 gals SLF 04-19-13
Total fluid used in treatment (bbls):2635Max pressure during treatment (psi):3464
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):2635Total flowback volume recovered (bbls):903
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):109559Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8257 ft.# Of Holes:75
Interval Bottom:8290 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/4/2013                  Interval Top: 7828 ft.    Interval Bottom: 7847 ft.

 Completed Information for Formation CODELL
1st Production Date:5/9/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/20/2013Treatment End Date:4/20/2013
Treatment Summary:Set CFP @ 7900'. 04-20-13 Frac'd the Codell with 109,636# 40/70 with 112,518 gals SLF. 04-20-13
Total fluid used in treatment (bbls):2679Max pressure during treatment (psi):6214
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.45
Recycled water used in treatment (bbls):2679Total flowback volume recovered (bbls):903
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):109636Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7828 ft.# Of Holes:75
Interval Bottom:7847 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/11/2013                 Interval Top: 7593 ft.    Interval Bottom: 8290 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:5/9/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/11/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 7550'. 04-22-13 Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 04-25-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8227 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/11/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 181
BBLS_OIL 50
BTU_GAS 1187
CALC_BBLS_H2O 181
CALC_BBLS_OIL 50
CALC_GOR 37460
CALC_MCF_GAS 373
CASING_PRESS 1873
GRAVITY_OIL 49
MCF_GAS 373
TUBING_PRESS 1097
Perforation Data:
Interval Top:7593 ft.# Of Holes:234
Interval Bottom:8290 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 11/7/2022                 Interval Top: 7593 ft.    Interval Bottom: 7847 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/9/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7593 ft.# Of Holes:159
Interval Bottom:7847 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/4/2013                  Interval Top: 7593 ft.    Interval Bottom: 7614 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/9/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/21/2013
Treatment Summary:Set CFP @ 7654'. 04-20-13 Frac'd the Niobrara with 108,137# 40/70 with 111,384 gals SLF. 04-21-13
Total fluid used in treatment (bbls):2575Max pressure during treatment (psi):5491
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):2575Total flowback volume recovered (bbls):903
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):108137Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7593 ft.# Of Holes:84
Interval Bottom:7614 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/07/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No