Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34913
Well Classification: OW Status: PR - 12/1/2019
Well Name/No:WEISS #29N-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2019
FacilityID:427236LocationID:333181
County:WELD #123Location:SWSW 33 3N66W 6
Field:WATTENBERG - #90750Elevation:4914 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:712FSL  586 FWLLat/Long: 40.176157 / -104.789531Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176160 / -104.789530Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/24/2012
End Date: 10/24/2012
Reported: 12/20/2012
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2019             Measured TD: 11729 ft.    Vertical TD: 7169 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/5/2014
Proposed Top PZ Location:Sec:33 Twp: 3N 66W Footage: 738 FSL  1094 FWL
Bottom Hole Location:Sec:33 Twp: 3N 66W Footage: 477 FNL  1142 FWL
Proposed Depth/Form:11758 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 700 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7563 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 740, Top: , Bottom: 7563 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6495 ft., Depth: 11758 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/1/2012
Spud Date:3/28/2012Spud Date Is:ACTUAL
Measured TD:11729 ft.Measured PB depth:11710 ft.
True Vertical TD:7169 ft.True Vertical PB depth:7169 ft.
Top PZ Location:Sec:33 Twp: 3N 66WFootage: 738 FSL  1094 FWL
Bottom Hole Location:Sec:33 Twp: 3N 66WFootage: 477 FNL  1142 FWL
Log Types:PRE FORM 5
Log Types:CBL; NFE-GR; MPR-GR; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 725 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 725 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7672 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 765, Top: 830 ft., Bottom: 7672 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6674 ft., Depth: 11719 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7236 ft.
NIOBRARA7409 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2019                 Interval Top: 7716 ft.    Interval Bottom: 11729 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/9/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/24/2012Treatment End Date:10/24/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7716-11729. 10493 BBL PERMSTIM, 41762 BBL FR WATER, 109 BBL LINEAR GEL, 52363 BBL TOTAL FLUID. 1053050# 40/70 SAND, 279460# 30/50 SAND, 24580# 20/40 SAND, 1357090# TOTAL PROPPANT.
Total fluid used in treatment (bbls):52363Max pressure during treatment (psi):6692
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4600
Fresh water used in treatment (bbls):41762Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1357090Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7090 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/25/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 298
BTU_GAS 1219
CALC_BBLS_OIL 298
CALC_GOR 3282
CALC_MCF_GAS 978
CASING_PRESS 1892
GRAVITY_OIL 50
MCF_GAS 978
TUBING_PRESS 1213
Perforation Data:
Interval Top:7716 ft.# Of Holes:0
Interval Bottom:11729 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1995
Total Gas Produced (MCF)23095
GOR11576
GOR DeterminationBOE
Average BOE per Day16.387
Average MCFE per Day95.044

 Federal Financial Assurance  i 

 Tribal Well  i No