|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 10224 ft. Vertical TD: 6147 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/29/2013 | | Proposed Depth/Form: | 6625 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-75 , Unit Acreage: 640, Drill Unit: sec. 2 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: , Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36.0 , Citings Type: PLANNED | | Cement: | Sacks: 362, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6422 ft., Weight: 29 , Citings Type: PLANNED | | Cement: | Sacks: 459, Top: 0 ft., Bottom: 6422 ft. | | Casing: | String Type: 2ND, Hole Size: 6 in., Size: 4.5 in., Top: 0 ft., Depth: 10219 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 6/27/2012 | | Spud Date: | 6/14/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 10224 ft. | Measured PB depth: | 10224 ft. | | True Vertical TD: | 6147 ft. | True Vertical PB depth: | 6147 ft. | | Top PZ Location: | Sec:2 Twp: 9N 59W | Footage: 838 FNL 1963 FWL | | Bottom Hole Location: | Sec:2 Twp: 9N 59W | Footage: 676 FSL 2001 FWL | | Log Types: | AI,CPD/CND, HVC,SB/GR/CC | | Casing: | String Type: SURF, Hole Size: 9.625 in., Size: 13.5 in., Top: 0 ft., Depth: 1542 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 797, Top: 0 ft., Bottom: 1542 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7 in., Size: 8.75 in., Top: 0 ft., Depth: 6424 ft., Weight: 29 , Citings Type: ACTUAL | | Cement: | Sacks: 469, Top: 3680 ft., Bottom: 6424 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 4.5 in., Size: 6 in., Top: 5369 ft., Depth: 10224 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 0 ft. | | | | | PIERRE | 694 ft. | | | | | NIOBRARA | 5998 ft. | | | | | CODELL | 6323 ft. | | | | | GREENHORN | 6419 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 6424 ft. Interval Bottom: 10224 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/29/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/1/2012 | Treatment End Date: | 8/2/2012 | | Treatment Summary: | 18 Stage pHaserFrac using 378,860# 40/70 Ottawa sand, 1,532,640# 20/40 Ottawa sand, 360,020# SB Excel with 48,805 bbls slick water. | | Total fluid used in treatment (bbls): | 48805 | Max pressure during treatment (psi): | 6372 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 23.00 | | Type Of gas: | | Number Of staged intervals: | 18 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 27259 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2282766 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5303 ft. | | Tubing Packer Depth: | 5297 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/29/2012 | Test Method: | Separator | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 195 | | BBLS_OIL | 231 | | BTU_GAS | 1464 | | CALC_BBLS_H2O | 195 | | CALC_BBLS_OIL | 231 | | CALC_GOR | 948 | | CALC_MCF_GAS | 218 | | CASING_PRESS | 50 | | GRAVITY_OIL | 35 | | MCF_GAS | 218 | | TUBING_PRESS | 2600 |
| | Perforation Data: | | Interval Top: | 6424 ft. | # Of Holes: | | | Interval Bottom: | 10224 ft. | Hole Size: | |
|
Sidetrack #01 Wellbore Classification: Status: AB - 9/28/2012 Measured TD: | Wellbore Data for Sidetrack #01 | Wellbore Classification: AB - 9/28/2012 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 12/29/2013 | | Proposed Top PZ Location: | Sec:2 Twp: 9N 59W | Footage: 858 FNL 1951 FWL | | Bottom Hole Location: | Sec:2 Twp: 9N 59W | Footage: 660 FSL 1981 FWL | | Proposed Depth/Form: | 10219 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-75 , Unit Acreage: 640, Drill Unit: Sec. 2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 6/14/2012 | Spud Date Is: | NOTICE | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | No formation data to display. |
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1312 |
| Total Gas Produced (MCF) | 4507 |
| GOR | 3435 |
| GOR Determination | BOE |
| Average BOE per Day | 5.708 |
| Average MCFE per Day | 33.094 |
| Federal Financial Assurance | i | |
|
|