|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/25/2023 Measured TD: 7905 ft. Vertical TD: 7790 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/25/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/26/2013 | | Proposed Top PZ Location: | Sec:16 Twp: 3N 65W | Footage: 2543 FSL 53 FEL | | Bottom Hole Location: | Sec:16 Twp: 3N 65W | Footage: 2532 FSL 48 FEL | | Proposed Depth/Form: | 7409 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 487, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7409 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 623, Top: , Bottom: 7409 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/15/2012 | | Spud Date: | 5/10/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7905 ft. | Measured PB depth: | 6134 ft. | | True Vertical TD: | 7790 ft. | True Vertical PB depth: | 6019 ft. | | Top PZ Location: | Sec:16 Twp: 3N 65W | Footage: 2543 FSL 53 FEL | | Bottom Hole Location: | Sec:16 Twp: 3N 65W | Footage: 2532 FSL 48 FEL | | Log Types: | Caliper/Comp. Density/Neutron/GR/SP/ML
DIL/GR/SP/Caliper
CBL/CCL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 966 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 394, Top: 0 ft., Bottom: 966 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 3673 ft., Depth: 7889 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 830, Top: 3673 ft., Bottom: 7889 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 382 ft. | | | | | PARKMAN | 3943 ft. | | | | | SUSSEX | 4487 ft. | | | | | SHANNON | 5062 ft. | | | | | NIOBRARA | 6932 ft. | | | | | CODELL | 7251 ft. | | | | | J SAND | 7708 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 9/25/2023 Interval Top: 7722 ft. Interval Bottom: 7764 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/3/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/1/2012 | Treatment End Date: | 7/1/2012 | | Treatment Summary: | PUMPED 290526# OF OTTAWA SAND DOWNHOLE IN 164808GALS OF SilverStim/SLICK/GELLED WATER.
CODELL & J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. | | Total fluid used in treatment (bbls): | 3924 | Max pressure during treatment (psi): | 3446 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 290526 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7704 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7722 ft. | # Of Holes: | 128 | | Interval Bottom: | 7764 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/13/2012 Interval Top: 7253 ft. Interval Bottom: 7267 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/3/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/1/2012 | Treatment End Date: | 7/1/2012 | | Treatment Summary: | PUMPED 243188# OF OTTAWA SAND DOWNHOLE IN 127470GALS OF SilverStim/15% HCL/SLICK/GELLED/ WATER.
CODELL & J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS.
| | Total fluid used in treatment (bbls): | 3035 | Max pressure during treatment (psi): | 4424 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 0.87 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 243188 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7704 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7253 ft. | # Of Holes: | 56 | | Interval Bottom: | 7267 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/10/2012 Interval Top: 6962 ft. Interval Bottom: 7764 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 7/3/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7704 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/10/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1223 | | CALC_MCF_GAS | 646 | | CASING_PRESS | 1250 | | MCF_GAS | 646 |
| | Perforation Data: | | Interval Top: | 6962 ft. | # Of Holes: | 232 | | Interval Bottom: | 7764 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/25/2023 Interval Top: 6962 ft. Interval Bottom: 7267 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/3/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7704 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/10/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1223 | | CALC_MCF_GAS | 646 | | CASING_PRESS | 1250 | | MCF_GAS | 646 |
| | Perforation Data: | | Interval Top: | 6962 ft. | # Of Holes: | 104 | | Interval Bottom: | 7267 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/13/2012 Interval Top: 6962 ft. Interval Bottom: 7030 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/3/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/1/2012 | Treatment End Date: | 7/1/2012 | | Treatment Summary: | PUMPED 243188# OF OTTAWA SAND DOWNHOLE IN 163296GALS OF SilverStim/SLICK/GELLED WATER.
CODELL & J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. | | Total fluid used in treatment (bbls): | 3888 | Max pressure during treatment (psi): | 4725 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 243188 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7704 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6962 ft. | # Of Holes: | 48 | | Interval Bottom: | 7030 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/25/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|