|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/25/2023 Measured TD: 7850 ft. Vertical TD: 7761 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/25/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/26/2013 | | Proposed Top PZ Location: | Sec:16 Twp: 3N 65W | Footage: 1336 FSL 60 FEL | | Bottom Hole Location: | Sec:16 Twp: 3N 65W | Footage: 1339 FSL 48 FEL | | Proposed Depth/Form: | 7385 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 487, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7385 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 620, Top: , Bottom: 7385 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/17/2012 | | Spud Date: | 5/16/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7850 ft. | Measured PB depth: | 7796 ft. | | True Vertical TD: | 7761 ft. | True Vertical PB depth: | 7707 ft. | | Top PZ Location: | Sec:16 Twp: 3N 65W | Footage: 1336 FSL 60 FEL | | Bottom Hole Location: | Sec:16 Twp: 3N 65W | Footage: 1339 FSL 48 FEL | | Log Types: | CBL
| | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 955 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 378, Top: 0 ft., Bottom: 955 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7840 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 780, Top: 3331 ft., Bottom: 7840 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2857 ft. | | | | | PARKMAN | 3816 ft. | | | | | SUSSEX | 4477 ft. | | | | | SHANNON | 5077 ft. | | | | | NIOBRARA | 6910 ft. | | | | | FORT HAYS | 7200 ft. | | | | | CODELL | 7222 ft. | | | | | J SAND | 7686 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 9/25/2023 Interval Top: 7700 ft. Interval Bottom: 7742 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/29/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/25/2012 | Treatment End Date: | 6/25/2012 | | Treatment Summary: | PUMPED 266393# OTTAWA SAND and 17636#SB Excel DOWNHOLE in 161532gals of SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA PANEL
| | Total fluid used in treatment (bbls): | 3846 | Max pressure during treatment (psi): | 2800 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 305 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 3541 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 284029 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7700 ft. | # Of Holes: | 128 | | Interval Bottom: | 7742 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 4/12/2013 Interval Top: 7224 ft. Interval Bottom: 7238 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/29/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/25/2012 | Treatment End Date: | 6/25/2012 | | Treatment Summary: | PUMPED 245973# OTTAWA SAND DOWNHOLE in 127974gals of 15% HCL/SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA PANEL
| | Total fluid used in treatment (bbls): | 3047 | Max pressure during treatment (psi): | 4155 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 253 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 2782 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 245973 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7224 ft. | # Of Holes: | 56 | | Interval Bottom: | 7238 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/6/2012 Interval Top: 6941 ft. Interval Bottom: 7742 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/29/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/6/2012 | Treatment End Date: | N/A | | Treatment Summary: | FLOWBACK REPORTED ON THE NIOBRARA COMPLETION PANEL
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/6/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 50 | | BTU_GAS | 1202 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 8000 | | CALC_MCF_GAS | 400 | | CASING_PRESS | 310 | | GRAVITY_OIL | 51 | | MCF_GAS | 400 |
| | Perforation Data: | | Interval Top: | 6941 ft. | # Of Holes: | 232 | | Interval Bottom: | 7742 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/25/2023 Interval Top: 6941 ft. Interval Bottom: 7238 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/29/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/12/2013 | Treatment End Date: | N/A | | Treatment Summary: | FLOWBACK REPORTED ON THE NIOBRARA COMPLETION PANEL
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6941 ft. | # Of Holes: | 104 | | Interval Bottom: | 7238 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 4/12/2013 Interval Top: 6941 ft. Interval Bottom: 7004 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/29/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/25/2012 | Treatment End Date: | 6/25/2012 | | Treatment Summary: | PUMPED 248757# OTTAWA SAND DOWNHOLE in 170940gals of SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER
FLOWBACK REPORTED ON THE NIOBRARA COMPLETION PANEL
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
| | Total fluid used in treatment (bbls): | 4070 | Max pressure during treatment (psi): | 4575 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | 270 | Total flowback volume recovered (bbls): | 900 | | Fresh water used in treatment (bbls): | 3800 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 248757 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6941 ft. | # Of Holes: | 48 | | Interval Bottom: | 7004 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/25/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|