Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34852
Well Classification: OW Status: PA - 9/25/2023
Well Name/No:Megan State #H15-33D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:70-7899
Facility Status:PAStatus Date9/25/2023
FacilityID:427071LocationID:327713
County:WELD #123Location:NESE 16 3N65W 6
Field:WATTENBERG - #90750Elevation:4818 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1914FSL  646 FELLat/Long: 40.223420 / -104.661690Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.223425 / -104.661688Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/1/2012
End Date: 7/1/2012
Reported: 7/3/2012
Days to report: 2
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 9/25/2023             Measured TD: 7850 ft.    Vertical TD: 7761 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 9/25/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/26/2013
Proposed Top PZ Location:Sec:16 Twp: 3N 65W Footage: 1336 FSL  60 FEL
Bottom Hole Location:Sec:16 Twp: 3N 65W Footage: 1339 FSL  48 FEL
Proposed Depth/Form:7385 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 487, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7385 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 620, Top: , Bottom: 7385 ft.

Wellbore Completed
Completion Date:5/17/2012
Spud Date:5/16/2012Spud Date Is:ACTUAL
Measured TD:7850 ft.Measured PB depth:7796 ft.
True Vertical TD:7761 ft.True Vertical PB depth:7707 ft.
Top PZ Location:Sec:16 Twp: 3N 65WFootage: 1336 FSL  60 FEL
Bottom Hole Location:Sec:16 Twp: 3N 65WFootage: 1339 FSL  48 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 955 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 378, Top: 0 ft., Bottom: 955 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7840 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 3331 ft., Bottom: 7840 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE2857 ft.
PARKMAN3816 ft.
SUSSEX4477 ft.
SHANNON5077 ft.
NIOBRARA6910 ft.
FORT HAYS7200 ft.
CODELL7222 ft.
J SAND7686 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 9/25/2023                 Interval Top: 7700 ft.    Interval Bottom: 7742 ft.

 Completed Information for Formation J SAND
1st Production Date:6/29/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/25/2012Treatment End Date:6/25/2012
Treatment Summary:PUMPED 266393# OTTAWA SAND and 17636#SB Excel DOWNHOLE in 161532gals of SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA PANEL
Total fluid used in treatment (bbls):3846Max pressure during treatment (psi):2800
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):305Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3541Disposition method For flowback:RECYCLE
Total proppant used (lbs):284029Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7700 ft.# Of Holes:128
Interval Bottom:7742 ft.Hole Size:0.41 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/12/2013                 Interval Top: 7224 ft.    Interval Bottom: 7238 ft.

 Completed Information for Formation CODELL
1st Production Date:6/29/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/25/2012Treatment End Date:6/25/2012
Treatment Summary:PUMPED 245973# OTTAWA SAND DOWNHOLE in 127974gals of 15% HCL/SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA PANEL
Total fluid used in treatment (bbls):3047Max pressure during treatment (psi):4155
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):253Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2782Disposition method For flowback:RECYCLE
Total proppant used (lbs):245973Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7224 ft.# Of Holes:56
Interval Bottom:7238 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 7/6/2012                  Interval Top: 6941 ft.    Interval Bottom: 7742 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/29/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:7/6/2012Treatment End Date:N/A
Treatment Summary:FLOWBACK REPORTED ON THE NIOBRARA COMPLETION PANEL CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/6/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 50
BTU_GAS 1202
CALC_BBLS_H2O 25
CALC_BBLS_OIL 50
CALC_GOR 8000
CALC_MCF_GAS 400
CASING_PRESS 310
GRAVITY_OIL 51
MCF_GAS 400
Perforation Data:
Interval Top:6941 ft.# Of Holes:232
Interval Bottom:7742 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 9/25/2023                 Interval Top: 6941 ft.    Interval Bottom: 7238 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/29/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:4/12/2013Treatment End Date:N/A
Treatment Summary:FLOWBACK REPORTED ON THE NIOBRARA COMPLETION PANEL CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6941 ft.# Of Holes:104
Interval Bottom:7238 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 4/12/2013                 Interval Top: 6941 ft.    Interval Bottom: 7004 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/29/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/25/2012Treatment End Date:6/25/2012
Treatment Summary:PUMPED 248757# OTTAWA SAND DOWNHOLE in 170940gals of SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER FLOWBACK REPORTED ON THE NIOBRARA COMPLETION PANEL CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):4070Max pressure during treatment (psi):4575
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):270Total flowback volume recovered (bbls):900
Fresh water used in treatment (bbls):3800Disposition method For flowback:RECYCLE
Total proppant used (lbs):248757Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6941 ft.# Of Holes:48
Interval Bottom:7004 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/25/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No