Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34806
Well Classification: OW Status: PR - 6/2/2012
Well Name/No:CECIL USX A #01-65-1HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/2/2012
FacilityID:426898LocationID:426897
County:WELD #123Location:SENE 1 6N64W 6
Field:WATTENBERG - #90750Elevation:4737 ft.
Planned Location:2120FNL  246 FELLat/Long: 40.516880 / -104.489670Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.516880 / -104.489680Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/16/2012
End Date: 5/16/2012
Reported: 6/26/2012
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/2/2012             Measured TD: 11225 ft.    Vertical TD: 6797 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/2/2012
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/15/2013
Prop Depth/Form:11217 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 419, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7218 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 505, Top: , Bottom: 7218 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7100 ft., Depth: 11217 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/13/2012
Spud Date:3/5/2012Spud Date Is:ACTUAL
Measured TD:11225 ft.Measured PB depth:11212 ft.
True Vertical TD:6797 ft.True Vertical PB depth:6784 ft.
Top PZ Location:Sec:1 Twp: 6N 64WFootage: 2330 FSL  841 FELDepth
Bottom Hole Location:Sec:1 Twp: 6N 64WFootage: 2304 FSL  535 FWLDepth
Log Types:CBL/GRL/CCL/VDL. No other logs sent at this time.
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 24 ft., Depth: 124 ft., Weight: 84.00 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 124 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 24 ft., Depth: 932 ft., Weight: 36.00 , Citings Type: ACTUAL
Cement:Sacks: 391, Top: 0 ft., Bottom: 941 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 24 ft., Depth: 7188 ft., Weight: 26.00 , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 670 ft., Bottom: 7198 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7093 ft., Depth: 11215 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3717 ft.
SUSSEX4523 ft.
SHANNON5151 ft.
NIOBRARA6809 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/2/2012                  Interval Top: 7340 ft.    Interval Bottom: 11133 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/29/2012Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/16/2012
Treatment Summary:Frac'd the Niobrara w/ 2856384 gals of pHaserFrac and Slick Water with 3,920,000#s of Ottawa sand.
Tubing Size:2.875 in.Tubing Setting Depth:7110 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/2/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 424
BBLS_OIL 117
BTU_GAS 1196
CALC_BBLS_H2O 424
CALC_BBLS_OIL 117
CALC_GOR 1649
CALC_MCF_GAS 193
CASING_PRESS 775
GRAVITY_OIL 44
MCF_GAS 193
Perforation Data:
Interval Top:7340 ft.# Of Holes:0
Interval Bottom:11133 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)3083
Total Gas Produced (MCF)17359
GOR5630
GOR DeterminationBOE
Average BOE per Day16.604
Average MCFE per Day96.299

 Federal Financial Assurance  i 

 Tribal Well  i No