|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2022 Measured TD: 8382 ft. Vertical TD: 8166 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/16/2013 | | Proposed Top PZ Location: | Sec:2 Twp: 1N 67W | Footage: 1350 FNL 2550 FWL | | Bottom Hole Location: | Sec:2 Twp: 1N 67W | Footage: 1350 FNL 2550 FWL | | Proposed Depth/Form: | 8357 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 6/16/2012 | | Spud Date: | 6/12/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8382 ft. | Measured PB depth: | 8096 ft. | | True Vertical TD: | 8166 ft. | True Vertical PB depth: | 7880 ft. | | Top PZ Location: | Sec:2 Twp: 1N 67W | Footage: 1336 FNL 2562 FWL | | Bottom Hole Location: | Sec:2 Twp: 1N 67W | Footage: 1340 FNL 2577 FWL | | Log Types: | PRE FORM 5 | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 929 ft., Weight: 4 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8372 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 8096 ft., Bottom: 8372 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8096 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1025, Top: 836 ft., Bottom: 8096 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4495 ft. | | | | | SUSSEX | 4876 ft. | | | | | SHANNON | 5361 ft. | | | | | NIOBRARA | 7553 ft. | | | | | FORT HAYS | 7767 ft. | | | | | CODELL | 7790 ft. | | | | | J SAND | 8231 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 9/27/2013 Interval Top: 7784 ft. Interval Bottom: 7802 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/3/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/17/2013 | Treatment End Date: | 5/17/2013 | | Treatment Summary: | 4957 BBL SLICKWATER, 4957 BBL TOTAL FLUID.
150160# 40/70 SAND, 4000# 20/40 SAND, 154160# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 4957 | Max pressure during treatment (psi): | 5284 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 401 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154160 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7784 ft. | # Of Holes: | 54 | | Interval Bottom: | 7802 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 3/1/2022 Interval Top: 7560 ft. Interval Bottom: 7802 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/3/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/6/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 90 | | BTU_GAS | 1134 | | CALC_BBLS_OIL | 90 | | CALC_GOR | 1111 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1133 | | GRAVITY_OIL | 48 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7560 ft. | # Of Holes: | 120 | | Interval Bottom: | 7802 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 9/27/2013 Interval Top: 7560 ft. Interval Bottom: 7646 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/3/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/9/2013 | Treatment End Date: | 5/17/2013 | | Treatment Summary: | 5890 BBL SLICKWATER, 6 BBL ACID, 5896 BBL TOTAL FLUID.
200200# 40/70 SAND, 4500# 20/40 SAND, 204700# TOTAL SAND. | | Total fluid used in treatment (bbls): | 5896 | Max pressure during treatment (psi): | 5378 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 401 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204700 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7560 ft. | # Of Holes: | 66 | | Interval Bottom: | 7646 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 02/28/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|