|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2022 Measured TD: 8260 ft. Vertical TD: 8159 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/14/2013 | | Proposed Top PZ Location: | Sec:2 Twp: 1N 67W | Footage: 2130 FNL 510 FWL | | Bottom Hole Location: | Sec:2 Twp: 1N 67W | Footage: 2130 FNL 510 FWL | | Proposed Depth/Form: | 8515 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24.0 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8272 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8272 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/5/2012 | | Spud Date: | 6/1/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8260 ft. | Measured PB depth: | 7999 ft. | | True Vertical TD: | 8159 ft. | True Vertical PB depth: | 7898 ft. | | Top PZ Location: | Sec:2 Twp: 1N 67W | Footage: 2123 FNL 530 FWL | | Bottom Hole Location: | Sec:2 Twp: 1N 67W | Footage: 2139 FNL 529 FWL | | Log Types: | PRE FORM 5 | | Log Types: | NEUTRON DENSITY RESISTIVITY , CBL, Triple Combo. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 932 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 15 ft., Bottom: 932 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8250 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 7999 ft., Bottom: 8250 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 715 ft., Depth: 7999 ft., Bottom: 7999 ft., Sacks: 980, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 2384 ft., Depth: 7999 ft., Bottom: 7999 ft., Sacks: 980, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4210 ft. | 4477 ft. | | | | SUSSEX | 4600 ft. | 4857 ft. | | | | SHANNON | 5184 ft. | 5290 ft. | | | | NIOBRARA | 7368 ft. | | | | | FORT HAYS | 7664 ft. | | | | | CODELL | 7685 ft. | | | | | J SAND | 8114 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 9/26/2013 Interval Top: 7687 ft. Interval Bottom: 7703 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/3/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/15/2013 | Treatment End Date: | 5/15/2013 | | Treatment Summary: | 5006 BBL SLICKWATER, 5006 BBL TOTAL FLUID.
150000# 40/70 SAND, 4000# 20/40 SAND, 154000# TOTAL SAND. | | Total fluid used in treatment (bbls): | 5006 | Max pressure during treatment (psi): | 4738 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.81 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 358 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7687 ft. | # Of Holes: | 64 | | Interval Bottom: | 7703 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 3/1/2022 Interval Top: 7464 ft. Interval Bottom: 7703 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/3/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/6/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 90 | | BTU_GAS | 1134 | | CALC_BBLS_OIL | 90 | | CALC_GOR | 922 | | CALC_MCF_GAS | 83 | | CASING_PRESS | 787 | | GRAVITY_OIL | 48 | | MCF_GAS | 83 |
| | Perforation Data: | | Interval Top: | 7464 ft. | # Of Holes: | 124 | | Interval Bottom: | 7703 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 9/26/2013 Interval Top: 7464 ft. Interval Bottom: 7558 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/3/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/15/2013 | Treatment End Date: | 5/15/2013 | | Treatment Summary: | 5827 BBL SLICKWATER, 5827 BBL TOTAL FLUID.
200250# 40/70 SAND, 4000# 20/40 SAND, 204250# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 5827 | Max pressure during treatment (psi): | 4940 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.83 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 358 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204250 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7464 ft. | # Of Holes: | 60 | | Interval Bottom: | 7558 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 02/28/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|