|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/1/2021 Measured TD: 7990 ft. Vertical TD: 7921 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/12/2013 | | Proposed Top PZ Location: | Sec:35 Twp: 3N 67W | Footage: 37 FNL 2541 FEL | | Bottom Hole Location: | Sec:35 Twp: 3N 67W | Footage: 37 FNL 2543 FEL | | Proposed Depth/Form: | 7946 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7946 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 168, Top: 6903 ft., Bottom: 7946 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4633 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 83, Top: 4033 ft., Bottom: 4633 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/31/2013 | | Spud Date: | 1/26/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 7990 ft. | Measured PB depth: | 7949 ft. | | True Vertical TD: | 7921 ft. | True Vertical PB depth: | 7880 ft. | | Top PZ Location: | Sec:35 Twp: 3N 67W | Footage: 37 FNL 2541 FEL | | Bottom Hole Location: | Sec:35 Twp: 3N 67W | Footage: 37 FNL 2543 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 796 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 808 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7976 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 2660 ft., Bottom: 7990 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4272 ft. | | | | | NIOBRARA | 7128 ft. | | | | | CODELL | 7389 ft. | | | | | J SAND | 7830 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 10/1/2021 Interval Top: 7831 ft. Interval Bottom: 7870 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/7/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/1/2013 | Treatment End Date: | 4/3/2013 | | Treatment Summary: | Frac'd the J Sand with 102,100# 40/70 sand and 94,569 gals SLF. 04-03-13 | | Total fluid used in treatment (bbls): | 2252 | Max pressure during treatment (psi): | 4739 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.68 | | Recycled water used in treatment (bbls): | 2252 | Total flowback volume recovered (bbls): | 501 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 102100 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7831 ft. | # Of Holes: | 75 | | Interval Bottom: | 7870 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/16/2013 Interval Top: 7391 ft. Interval Bottom: 7410 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/12/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/3/2013 | Treatment End Date: | 4/3/2013 | | Treatment Summary: | Set CFP @ 7458'. 04-03-13
Frac'd the Codell with 98,380# 40/70 # 40/70 sand and 94,252 gals SLF. 04-03-13 | | Total fluid used in treatment (bbls): | 2244 | Max pressure during treatment (psi): | 5203 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | 2244 | Total flowback volume recovered (bbls): | 501 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 98380 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7391 ft. | # Of Holes: | 57 | | Interval Bottom: | 7410 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/13/2013 Interval Top: 7171 ft. Interval Bottom: 7870 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/12/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/13/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 7120'. 04-03-13
Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 04-05-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7793 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/13/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 157 | | BBLS_OIL | 10 | | BTU_GAS | 1251 | | CALC_BBLS_H2O | 157 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 35000 | | CALC_MCF_GAS | 350 | | CASING_PRESS | 2375 | | GRAVITY_OIL | 53 | | MCF_GAS | 350 | | TUBING_PRESS | 309 |
| | Perforation Data: | | Interval Top: | 7171 ft. | # Of Holes: | 208 | | Interval Bottom: | 7870 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 10/1/2021 Interval Top: 7171 ft. Interval Bottom: 7410 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/12/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7171 ft. | # Of Holes: | 133 | | Interval Bottom: | 7410 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/16/2013 Interval Top: 7171 ft. Interval Bottom: 7190 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/12/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/3/2013 | Treatment End Date: | 4/3/2013 | | Treatment Summary: | Set CFP @ 7240'. 04-03-13
Frac'd the Niobrara with 100,120# 40/70 and 93,017 gals SLF. 04-03-13 | | Total fluid used in treatment (bbls): | 2215 | Max pressure during treatment (psi): | 5634 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 2215 | Total flowback volume recovered (bbls): | 501 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 100120 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7171 ft. | # Of Holes: | 76 | | Interval Bottom: | 7190 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 09/30/2021 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|