|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/19/2018 Measured TD: 8054 ft. Vertical TD: 7928 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/19/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/19/2013 | Proposed Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 1983 FSL 1988 FWL | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 1983 FSL 1988 FWL | Proposed Depth/Form: | 7974 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 255, Top: 0 ft., Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7974 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 168, Top: 6929 ft., Bottom: 7974 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4894 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 83, Top: 4294 ft., Bottom: 4894 ft. |
| | |
Wellbore Completed | Completion Date: | 4/25/2012 | Spud Date: | 4/19/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8054 ft. | Measured PB depth: | 7987 ft. | True Vertical TD: | 7928 ft. | True Vertical PB depth: | 7861 ft. | Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 2126 FSL 2072 FWL | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 2129 S 2087 W | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 876 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 0 ft., Bottom: 876 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8025 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 655, Top: 3560 ft., Bottom: 8025 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4499 ft. | | | | NIOBRARA | 7212 ft. | | | | CODELL | 7431 ft. | | | | J SAND | 7874 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 12/19/2018 Interval Top: 7875 ft. Interval Bottom: 7917 ft. Completed Information for Formation J SAND | 1st Production Date: | 6/20/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/10/2012 | Treatment Summary: | Frac'd the J-Sand 7875’– 7887’, 7905’- 7917’ (48 holes) w/ 118,776 gal 18 #
pHaserFrac Hybrid cross linked gel containing 251,450# 20/40 Sand. 05-30-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7875 ft. | # Of Holes: | 48 | Interval Bottom: | 7917 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/16/2012 Interval Top: 7432 ft. Interval Bottom: 7446 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/20/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/10/2012 | Treatment Summary: | Set CFP @ 7510'. 05-30-12
Frac'd the Codell 7432’ – 7446’, (42 holes) w/ 90,216 gal 22 # pHaserFrac Hybrid cross
linked gel containing 249,980 # 30/50 sand. 05-31-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7432 ft. | # Of Holes: | 42 | Interval Bottom: | 7446 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/31/2012 Interval Top: 7212 ft. Interval Bottom: 7917 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 6/20/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/31/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7150'. 07-12-12
Drilled out CBP @ 7150', CFP @ 7274', 7510' to commingle the JSND-NBRR-CDL. 07-13-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7845 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/31/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 58 | BBLS_OIL | 24 | BTU_GAS | 1248 | CALC_BBLS_H2O | 58 | CALC_BBLS_OIL | 24 | CALC_GOR | 12500 | CALC_MCF_GAS | 300 | CASING_PRESS | 799 | GRAVITY_OIL | 48 | MCF_GAS | 300 | TUBING_PRESS | 347 |
| Perforation Data: | Interval Top: | 7212 ft. | # Of Holes: | 138 | Interval Bottom: | 7917 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/19/2018 Interval Top: 7212 ft. Interval Bottom: 7446 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/20/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7212 ft. | # Of Holes: | 90 | Interval Bottom: | 7446 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/16/2012 Interval Top: 7212 ft. Interval Bottom: 7224 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/20/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/10/2012 | Treatment Summary: | Set CFP @ 7284'. 05-31-12
Frac'd the Niobrara 7212’ – 7224’ (48 holes), w/ 99,876 gals 18 # pHaserFrac Hybrid
cross linked gel containing 252,660# 30/50 sand. 05-31-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7212 ft. | # Of Holes: | 48 | Interval Bottom: | 7224 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 12/19/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|