|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 7/28/2023 Measured TD: 8925 ft. Vertical TD: 8507 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 7/28/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/4/2013 | | Proposed Top PZ Location: | Sec:36 Twp: 1N 68W | Footage: 510 FSL 510 FEL | | Bottom Hole Location: | Sec:36 Twp: 1N 68W | Footage: 510 FSL 510 FEL | | Proposed Depth/Form: | 9032 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: E/2SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 24.0 , Citings Type: PLANNED | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9032 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 9032 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/21/2012 | | Spud Date: | 2/16/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8925 ft. | Measured PB depth: | 8660 ft. | | True Vertical TD: | 8507 ft. | True Vertical PB depth: | 8242 ft. | | Top PZ Location: | Sec:36 Twp: 1N 68W | Footage: 529 FSL 521 FEL | | Bottom Hole Location: | Sec:36 Twp: 1N 68W | Footage: 532 FSL 507 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CBL; SD-DSN-AC-TR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1032 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 1032 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8916 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 8670 ft., Bottom: 8916 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8660 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1180, Top: 170 ft., Bottom: 8660 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4780 ft. | | | | | SUSSEX | 5283 ft. | | | | | NIOBRARA | 7900 ft. | | | | | FORT HAYS | 8328 ft. | | | | | CODELL | 8350 ft. | | | | | J SAND | 8780 ft. | | | |
Formation CODL Formation Classification: Status: CM - 7/24/2012 Interval Top: 8350 ft. Interval Bottom: 8366 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/28/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/19/2012 | Treatment End Date: | 6/19/2012 | | Treatment Summary: | PERF CODL 8350-8366 HOLES 64 SIZE .38
Frac CODL down 4.5" casing w/ 218,768 gal slickwater w/ 150,720# 40/70, 4,000# 20/40.
Broke @ 4,651 psi @ 3.8 bpm. ATP=4,525 psi; MTP=4,836 psi; ATR=59.5 bpm; ISDP=2,870 psi
| | Total fluid used in treatment (bbls): | 5209 | Max pressure during treatment (psi): | 4836 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154720 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8350 ft. | # Of Holes: | 64 | | Interval Bottom: | 8366 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/28/2023 Interval Top: 7908 ft. Interval Bottom: 8366 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/28/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/3/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 50 | | BTU_GAS | 1278 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 2000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 730 | | GRAVITY_OIL | 46 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7908 ft. | # Of Holes: | 128 | | Interval Bottom: | 8366 ft. | Hole Size: | 0.47 in. |
|
Formation NBRR Formation Classification: Status: CM - 7/24/2012 Interval Top: 7908 ft. Interval Bottom: 8208 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/28/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/19/2012 | Treatment End Date: | 6/19/2012 | | Treatment Summary: | PERF NBRR 7908-8208 HOLES 64 SIZE .47
Frac NBRR down 4.5" casing w/ 250 gal 15% HCl & 240,536 gal slickwater w/ 200,620# 40/70, 4,000# 20/40.
Broke @ 2,962 psi @ 3.5 bpm. ATP=4,419 psi; MTP=5,550 psi; ATR=60.5 bpm; ISDP=2,640 psi
| | Total fluid used in treatment (bbls): | 5727 | Max pressure during treatment (psi): | 5550 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 5 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204620 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7908 ft. | # Of Holes: | 64 | | Interval Bottom: | 8208 ft. | Hole Size: | 0.47 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/28/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|